My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
040715SP
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:46:12 PM
Creation date
4/1/2015 3:36:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/7/2015
DESTRUCT DATE
15Y
DOCUMENT NO
2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> III.ENGINEERING DIVISION <br /> Tract Joint Trench Plan Check $500.00_ <br /> Traffic Study Review $650.00 <br /> Amended Maps Base fee $140.00 <br /> plus fee per course correction $30.00 <br /> Lot Line Adjustment Base fee $1,330.00 <br /> plus fee per lot $40.00 <br /> Revised Erosion Hillside Base Fee $5,000.00 <br /> Control (SWPPP) plus fee per acre (disturbed area) $180.00 <br /> Flatland Base Fee $3,200.00 <br /> plus fee per acre (disturbed area) $135.00 <br /> Professional Consultant Expense Consultant cost <br /> +25% <br /> Subdivision Grading & up to 100,000 cubic yards see Chapter IV <br /> Erosion Control Plan Section F <br /> Check each additional 1,000 cubic yard after 100,000 $6.50 <br /> D. Construction Services Inspection <br /> (due 15 days prior to City Council approval of a final map or City Engineer approval of the plans, whichever <br /> occurs first) <br /> Subdivision Grading & Up to 100,000 cubic yards see Chapter IV <br /> Erosion Control Section F <br /> Inspection each additional 1,000 cubic yards over 100,000 $10.00 <br /> Construction Inspection <br /> City-inspected improvements: Base Fee Plus <br /> Valuation under$5,000 7.2%of valuation <br /> Valuation$5,000- $20,000 $360 2.76%of valuation >$5,000 <br /> Valuation over$20,000 $774 5%of valuation >$20,000 <br /> Specialized Inspections Consultant cost <br /> +25% <br /> Overtime Inspection <br /> (2 hour minimum charge) Cost+ Overhead <br /> E. Assessment Districts <br /> City Engineering Department Administration <br /> (during formation, design, and construction) Cost+ Overhead <br /> Inspection See Construction <br /> (Minimum charge is 4%of costs to construct public improvements) Inspec. Fee Table <br /> Segregation Administration <br /> Fee per district $500.00 <br /> 3/13/2015 III. Engineering: 4 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.