My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
040715SP
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:46:12 PM
Creation date
4/1/2015 3:36:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/7/2015
DESTRUCT DATE
15Y
DOCUMENT NO
2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> III.ENGINEERING DIVISION <br /> A. General <br /> Map Copies Map Reproduction (per sheet) $5.00 <br /> Plotted GIS Map(per sheet) $30.00 <br /> Specialized Map/Data Request Time& Materials <br /> Other Copies Standard Specifications & Details $20.00 <br /> B. Encroachment (Due upon obtaining permit) <br /> Permit Fee Inspection Fee <br /> Permit Fees Dry Utilities $150.00 <br /> Other $30.00 <br /> Inspection Fees Dry Utilities Time&Materials <br /> $90 minimum <br /> Other Valuation under$5,000 7.2%of valuation- $90 minimum <br /> Valuation $5,000 to$20,000 $360+2.76%of value over$5,000 <br /> Valuation over$20,000 $774+4%of value over$20,000 <br /> Reinspection Time&Materials <br /> $90 minimum <br /> Specialized Inspections Consultant Cost+ <br /> 25% <br /> Oversize Load Permit-Fee to One-time $16.00 <br /> update upon State fee change Annual $90.00 <br /> Haul Route Permit $60.00 <br /> C. Private Development Review (Due upon first submittal of plans or map) <br /> Base fee $2,500.00 <br /> Parcel Map plus fee per lot $30.00 <br /> Base fee $4,500.00 <br /> Final Map plus fee per lot $30.00 <br /> GIS Digital Compliance Time&Materials or <br /> Consultant cost + <br /> 25% <br /> Annexation Fees Annexation Processing Fee $8,790.00 <br /> Pre-Annexation Agreement Processing $4,470.00 <br /> GRAD Formation/Annexation Fee $3,150.00 <br /> Development Improvement Plan Check <br /> percentage of total cost of City-reviewed improvements 3.0% <br /> Improvement Plan Review/Revision & Plan Check <br /> after 4th revision $790.00 <br /> Traffic Signal(commercial off-site) <br /> Plan Check $2,000.00 <br /> Right of Way Dedication and Abandonment $1,380.00 <br /> Technology Fee(GIS Mapping)- per lot $50.00 <br /> 3/13/2015 III. Engineering: 3 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.