My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
040715SP
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:46:12 PM
Creation date
4/1/2015 3:36:24 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/7/2015
DESTRUCT DATE
15Y
DOCUMENT NO
2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> IV. BUILDING AND SAFETY DIVISION <br /> A. Building Permit Fees <br /> Whenever a Building Permit is required as prescribed in PMC 20.04.015,the Permit Fees, Plan Review Fees and <br /> other associated Fees will be determined by this section. <br /> VALUATION SCHEDULE <br /> NEW CONSTRUCTION&ADDITIONS Permit Valuation shall be determined by the New <br /> -Commercial &Industrial Buildings Construction Valuation Table of the Building Division in <br /> - Dwellings effect at the date of application, or as otherwise <br /> -Garages &Accessory Structures determined by the Building and Safety Official. The Table <br /> shall be revised annually on January 1 by the percentage <br /> increase or decrease in the Engineering News Record <br /> Construction Cost Index(CCI)for the San Francisco Bay <br /> Area. <br /> ALTERATIONS& REPAIRS <br /> - Remodels, Repairs, Reroofs, Tenant Improvements, Contract price of the work being performed, or as <br /> etc. otherwise determined by Building and Safety Official. <br /> BASIC FEE SCHEDULE <br /> Total Project Valuation Base Fee Plus <br /> $1 -$1,000 $85.00 <br /> $1,000- $2,000 $105.00 <br /> $2,001 - $25,000 $130.00 $11.75 for each additional $1,000(or fraction <br /> thereof) up to and including$25,000 <br /> $25,001 -$50,000 $400.00 $10.00 for each additional $1,000(or fraction <br /> thereof) up to and including$50,000 <br /> $50,001 -$100,000 $650.00 $7.00 for each additional $1,000 (or fraction <br /> thereof) up to and including$100,000 <br /> $100,001 -$500,000 $1,000.00 $5.75 for each additional $1,000(or fraction <br /> thereof) up to and including$500,000 <br /> $500,000-$1,000,000 $3,300.00 $4.60 for each additional $1,000 (or fraction <br /> thereof) up to and including$1,000,000 <br /> over$1,000,000 $5,600.00 $3.00 for each additional $1,000 (or fraction <br /> thereof) <br /> PERMIT SURCHARGES <br /> ELECTRICAL/MECHANICAL/PLUMBING (EMP) PERMIT SURCHARGE <br /> Unless specified elsewhere, applicable to all projects with multi-trade construction 25%of Building <br /> being performed in conjuction with a building permit. Permit Fee <br /> TITLE-24 ENERGY SURCHARGE <br /> Unless specified elsewhere, applicable to permitted projects subject to compliance 25% of Building <br /> with Title 24, Part 6, The California Energy Code. Permit Fee <br /> ACCESSIBILITY SURCHARGE <br /> Applicable to plan review of all projects requiring compliance with State of California 15% of Building <br /> Accessibility, FHAA and/or ADA Requirements. Permit Fee <br /> GREEN BUILDING SURCHARGE <br /> For all permits requiring compliance with California Green Building Standards 15% of Building <br /> (Includes Waste Management Fee). Permit Fee <br /> SWPPP(STORM WATER)SURCHARGE 15%of Building <br /> For all covered projects requiring on-site stormwater treatment or pre-treatment. Permit Fee <br /> 3/18/2015 IV. Building: 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.