My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
040715SP
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:46:00 PM
Creation date
4/1/2015 3:32:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/7/2015
DESTRUCT DATE
15Y
DOCUMENT NO
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Lorenzo King <br /> x15/15 <br /> Page 2 of 6 <br /> to Construction Review Services <br /> General Procedures:All direction to the contractor shall be made by City Staff. <br /> 5.01 Pre-construction Conference <br /> The consultant will attend a pre-construction conference to review the contract <br /> requirements with the contractor and City.Minutes will be prepared and distributed. <br /> 5.02 Shop Drawings,Samples,and Submittals Review <br /> Review and approve shop drawings,samples and other data which the Contractor is <br /> required to submit,but only for conformance with the design concept of the project <br /> and compliance with the Information given in the Construction Contract Documents. <br /> Such reviews and approvals or other action will not extend to means,methods, <br /> techniques,sequences or procedures of construction or to safety precautions and <br /> programs incident thereto. Budget for this task is based on up to two reviews for <br /> each submittal.Additional reviews should be charged to the contractor by the City. <br /> City shall be responsible for final approvals and Issuing all submittal reviews to the <br /> contractor. <br /> 5.03 Requests for Information(RFI's) <br /> In response to Contractor's requests,Harris Design will prepare and City Staff will <br /> issue necessary interpretations and clarifications of the Construction Contract <br /> Documents. <br /> 5.04 Requests for Quotations(RFQ's) <br /> Prepare RFQ's and City will issue to Contractor for change order quotations of <br /> additional work as requested by the City. <br /> 5.05 Change Orders <br /> Prepare bulletins,work directive changes and change orders as required.Provide to <br /> City Staff for their use. <br /> 5.06 Substitutions <br /> Evaluate and determine the acceptability of substitute materials and equipment <br /> proposed by the Contractor to the extent provided in the General Conditions of the <br /> construction contract. <br /> 5.07 Site Visits <br /> Make visits to the site at intervals appropriate to the various stages of construction in <br /> order to observe the progress and quality of the various aspects of the Contractor's <br /> work. Based on information obtained during such visits and on such observations, <br /> Hams Design will endeavor to determine,in general,if such work is proceeding in <br /> accordance with the contract documents. Harris Design will prepare and distribute a <br /> site observation report for each site visit. For budgeting for this project,Harris <br /> Design's site visits will be limited to 5o visits.Assumptions regarding the number of <br /> site visits for each subconsultant are itemized in their proposals(attached). <br /> Landreapo Arch tocluro I Park&Recreation Planning I Urban Ons:gn <br />
The URL can be used to link to this page
Your browser does not support the video tag.