My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
040715SP
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:46:00 PM
Creation date
4/1/2015 3:32:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/7/2015
DESTRUCT DATE
15Y
DOCUMENT NO
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> hours prior to installation. If a shock pad is required, the in-situ pad can be <br /> installed over the accepted base. Control of the finish grade and contour shall be <br /> the responsibility of the contractor. <br /> B. Seams: <br /> 1. All panel seams shall be securely sewn using a double stitch bagger seam <br /> and/or glued to a backing material of nylon or Mylar. <br /> 2. All panel seams spacing are to be held to a minimum of 15 feet unless prior <br /> approval of seaming diagram indicates a lesser panel. <br /> 3. All inlaid areas shall have full fastenings and no loose areas. At no time can <br /> pulling on the section separate the material. <br /> 4. All seams and inlaid areas shall be brushed thoroughly before infill materials <br /> are installed. <br /> C. Turf Edges and Termination <br /> All edges and ends of the turf shall be secured to a termination area. This <br /> termination shall be as detailed in the drawings. The contractor shall submit a <br /> shop drawing of this termination detail prior to any work on the site. <br /> 3.06 LINES, MARKINGS AND IN-LAID TURF <br /> A. There are inlays for all sports for this project. (See the Drawings) <br /> Colors that should be used: <br /> • All lines to be 4" wide <br /> • Center Field Logo Shall be Large within the soccer center <br /> circle.(alternate) <br /> 3.07 INSTALLATION OF IN-FILL <br /> A. In-fill material will consist of 1.5 LBS. per square foot Zeolite. Zeolite must be <br /> approved by the city's third party inspector prior to installation. <br /> 1. Zeolite Infill: as supplied by ZeoFill, Product lead time is 30 days minimum. <br /> Contact Brian Pierce 760.300.3920 ext. 1001. <br /> a. Mesh size 12 —20. <br /> • General Chemical Formula: Na6[AI6Si30O72]24H2O <br /> • Clinoptilolite Content: 97%+ <br /> • Cation Exchange Capacity: (CEC) 1.6 — 2.0 meg/g <br /> • Form: Granules <br /> • Shape Angular <br /> • Color Gray — green <br /> • Pore Diameter 4.0 — 7.0 angstroms <br /> • Specific Gravity 1.89 <br /> • Bulk Density 50 - 65 lbs/ft3 <br /> • pH (natural) 7.0 <br /> • Alkali Stability pH of 7 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.