Laserfiche WebLink
EXHIBIT A <br /> • Acid Stability pH of 3 - 7 <br /> • Hardness 4.2 - 4.5 Mohs <br /> • Swelling Index Nil <br /> B. The in-fill material shall be installed allowing an exposed fiber or 15mm after <br /> brushing. <br /> C. This contractor is responsible for the supply and installation of all in-fill materials <br /> and shall be required to return to the site after not less than 30 days to inspect <br /> and add in-fill materials as needed. <br /> D. No in-fill materials shall be installed until the turf system is fully installed with all <br /> lines and markings. <br /> E. The synthetic turf shall be thoroughly brushed prior to any in-fill materials to <br /> remove any wrinkles and defibrillated the slit film. <br /> F. The synthetic turf shall be brushed a minimum of 10 passes over each area prior <br /> to any in-fill areas. <br /> G. The in-fill materials shall be installed in layers not to exceed 0.375 pound per <br /> square foot per layer. <br /> H. The turf shall remain free draining at all times before, during and after the in-fill <br /> materials are installed. <br /> 3.08 GENERAL CLEANUP <br /> A. The site shall be kept clean and free of debris throughout the installation. Empty <br /> barrels, sacks, bags and remnant materials shall be stored or disposed daily in a <br /> proper container or legal manner. <br /> B. After completion of the entire project, the site shall have a general cleanup <br /> removing all debris remaining on the site that is not a part of the final project. <br /> B. The cost of each unit supplied to each project shall be a part of the total proposal <br /> cost and become the sole expense of the Synthetic Turf Contractor. <br />