Laserfiche WebLink
EXHIBIT A <br /> The pile surface shall be suitable for both temporary and permanent line. <br /> Markings and permanent markings using a rubber base paint where applicable. <br /> B. The pile height shall be constructed to allow a total of 3/4" of free fiber after the <br /> in-fill materials are installed. <br /> 2.06 SYNTHETIC TURF SYSTEM MATERIAL COMPONENTS <br /> A. Pile fibers shall resemble freshly grown natural grass in appearance, texture and <br /> color (except for the color turf for markings). <br /> B. Fibers shall be a combination of 55oz. of parallel slit film (1.5mm pattern — 100 <br /> microns) having a denier of 10,000 micron (before the oven), with 20% nylon <br /> (500 denier) monofilament as a thatch zone. Total fiber weight shall be not less <br /> than 74 ounces per square yard. <br /> C. Pile surface shall be nominally uniform in length not less than 1-1/4". <br /> D. The fibers are tufted through a triple layer (three separate layers) synthetic <br /> backing material. <br /> E. The final coating or secondary backing shall be a moisture cure polyurethane. <br /> This backing shall be not less than 20 ounces. Latex backing material is not <br /> acceptable. The secondary backing or polyurethane coating shall be uniform and <br /> monolithic when cured. <br /> F. If sewn, all turf seams shall be constructed of reinforced backing material or <br /> sewn with high strength polyester fiber cord. Sewn seams shall be a "double loop <br /> stitch" (bagger seams are not acceptable) type seam. Seams shall lay flat after <br /> in-fill. <br /> G. All glued seams shall have a 12" wide seaming tape of nylon or Mylar, fully <br /> coated with adhesive. All seams shall not have any adhesive applied to any <br /> exposed fibers. All graphics or markings can be in-laid or cut-in. <br /> H. All turf shall be perforated for drainage after the final backing coating. The <br /> perforations shall be not less than 1/4" in diameter and have a uniform spacing of <br /> not less than 4" on center. Perforations shall be complete and full diameter for a <br /> minimum of 95% of the each roll. <br /> I. On-site perforations are to be inspected prior to installation of the product. <br /> J. Fabric surface shall be constructed and installed in minimum widths of 15 feet <br /> with no longitudinal or transverse seams, except for inlaid lines with a finished roll <br /> assembly. The seams shall be 15'-0" apart and shall have the white 5-yard line <br /> tufted into each panel for the full width of the field. Rolls that do not comply with <br />