My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
040715SP
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:46:00 PM
Creation date
4/1/2015 3:32:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/7/2015
DESTRUCT DATE
15Y
DOCUMENT NO
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> claim. This warranty shall constitute a contract made in the State of California <br /> and shall be governed by the laws of that State. <br /> G. In addition to the above, Contractor is required to adhere to warranty <br /> specifications as detailed in the City's Request for Proposals for the Purchase <br /> and Installation, Warranty Service and Maintenance of the Synthetic Turf for <br /> Three Multi-Use Sports Fields Being Constructed as Part of the Bemal <br /> Community Park, Phase II Construction Project dated January 12, 2015. <br /> PART 2 — MATERIALS <br /> 2.01 GENERAL <br /> A. The field surfacing system shall be a vertically draining permeable synthetic <br /> grass system consisting of a synthetic grass like pile that shall be tufted into a <br /> triple layer synthetic backing. The final coating shall be a polyurethane based <br /> material. <br /> B. The suppliers listed are capable vendors for the specified material. This <br /> specification will supersede any references to the vendors specifications or <br /> product literature. The specification is meant to identify the quality and quantity of <br /> the specific components and performance results. Any material exceeding the <br /> specifications shall be consider as an equal. Any material with variations from the <br /> specifications shall be approved by the Owner prior to acceptance under this <br /> specification and contract. <br /> C. The entire system shall be resistant to weather, insects, rot, mildew, fungus <br /> growth and be non-allergenic and non-toxic. The entire system shall be <br /> constructed to maximize dimensional stability, to resist damage and normal wear <br /> and tear from its designated uses and to minimize the ultra-violet degradation. <br /> D. All adhesives used in bonding the system together shall be resistant to moisture, <br /> bacterial and fungus attacks, and resistant to ultra-violet rays at any location <br /> upon installation. <br /> E. Include all labor, materials, equipment, transportation and services to install <br /> complete all-weather synthetic grass system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.