City of Pleasanton Recycled Water Project <br /> CEQA Addendum <br /> Table 3 <br /> Environmental Review of Proposed Project Changes <br /> Do Proposed <br /> Changes Are Prior <br /> Involve Any New Mitigation <br /> What were the New Circumstances Measures <br /> Where Impact(s) Environmental Significant Involving New Any New Sufficient for <br /> were Analyzed Impact or Significant Information Addressing <br /> in conclusions for Substantially Impacts Requiring Any New <br /> Prior the Original More or Substantially New Potential <br /> Environmental Proposed Severe More Severe Analysis or Changes or <br /> Environmental Issue Area Documents. Project? Impacts? Impacts? Verification? Impacts? <br /> IS/MND Mitigation Measures: <br /> • None identified or necessary <br /> Project Change Discussion: <br /> The proposed changes to the Proposed would have the same or less impact on public services as the Original <br /> Proposed Project. The addition of 720 feet or 0.1 mile of new pipeline would not result in any new impacts as was <br /> evaluated in the IS/MND. Also, the construction activities associated with the revised pipeline conveyance facilities <br /> would be substantially the same as they were originally described in the IS/MND as they would also be constructed <br /> within existing roadways, highly disturbed areas, and/or public right-of-ways. The Revised Proposed Project <br /> therefore would not have any incrementally significant effects on public services as defined in CEQA Guideline <br /> section 15162(a). <br /> Recreation IS/MND NI No No No Yes <br /> Page 3-36 <br /> IS/MND Discussion: <br /> The Proposed Project would not contribute to population growth. Therefore, the Proposed Project would not <br /> increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial <br /> physical deterioration of the facility would occur or be accelerated. As a result, no impact is expected and no <br /> mitigation is required. <br /> IS/MND Mitigation Measures: <br /> • None identified or necessary. <br /> Project Change Discussion: <br /> The proposed changes to the Proposed would have the same or less impact on recreation as the Original Proposed <br /> Project. The addition of 720 feet or 0.1 mile of new pipeline would not result in any new impacts as was evaluated <br /> in the IS/MND. Also, the construction activities associated with the revised pipeline conveyance facilities would be <br /> substantially the same as they were originally described in the IS/MND as they would also be constructed within <br /> existing roadways, highly disturbed areas, and/or public right-of-ways. The Revised Proposed Project therefore <br /> would not have any incrementally significant effects on recreation as defined in CEQA Guideline section 15162(a). <br /> IS/MND <br /> Socioeconomics Pages 3-37 LTS No No No Yes <br /> and 3-38 <br /> IS/MND Discussion: <br /> While, not a specific CEQA resource category, the IS/MND conducted an evaluation on the Proposed Project's <br /> potential to have socioeconomic impacts in order to comply with the National Environmental Policy Act (NEPA). <br /> As such, the IS/MND concluded that the Proposed Project would not have any socioeconomic impacts. The <br /> Proposed Project does not propose any features that would result in disproportionate adverse human health or <br /> environmental effects, have any physical effects on minority or low-income populations,and/or alter socioeconomic <br /> conditions of populations that reside or work within the City and vicinity. <br /> December 2014 3-10 <br />