My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
012015
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 2:02:27 PM
Creation date
1/14/2015 12:08:11 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/20/2015
DESTRUCT DATE
15Y
DOCUMENT NO
8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> City of Pleasanton Recycled Water Project <br /> CEQA Addendum <br /> Table 3 <br /> Environmental Review of Proposed Project Changes <br /> Do Proposed <br /> Changes Are Prior <br /> Involve Any New Mitigation <br /> What were the New Circumstances Measures <br /> Where Impact(s) Environmental Significant Involving New Any New Sufficient for <br /> were Analyzed Impact or Significant Information Addressing <br /> in conclusions for Substantially Impacts Requiring Any New <br /> Prior the Original More or Substantially New Potential <br /> Environmental Proposed Severe More Severe Analysis or Changes or <br /> Environmental Issue Area Documents. Project? Impacts? Impacts? Verification? Impacts? <br /> With implementation of the mitigation measures listed in the IS/MND, implementation of the Proposed Project <br /> would not result in any residual significant impacts related to increased risk of flooding from stormwater runoff, <br /> from water quality effects from long-term urban runoff, or from short-term alteration of drainages and associated <br /> surface water quality and sedimentation. Based on these circumstances,the Proposed Project would not result in any <br /> residual significant and unavoidable adverse impacts to surface water hydrology and water quality. <br /> IS/MND Mitigation Measures: <br /> • Mitigation Measure HWQ-l: Implement Construction Best Management Practices <br /> • Mitigation Measure HWQ-2: Avoid Cutting Through Creeks <br /> • Mitigation Measure HWQ-3: Implement Best Management Practices <br /> • Mitigation Measure HWQ-4: Implement Recycled Water Best Management Practices <br /> Project Change Discussion: <br /> The proposed changes to the Proposed would have the same impacts to hydrology and water quality than the <br /> Original Proposed Project. The addition of 720 feet or 0.1 mile of new pipeline would not result in any new impacts <br /> as was evaluated in the IS/MND. Also, the construction activities associated with the revised pipeline conveyance <br /> facilities would be substantially the same as they were originally described in the IS/MND as they would also be <br /> constructed within existing roadways, highly disturbed areas, and/or public right-of-ways. The Revised Proposed <br /> Project therefore would not have any incrementally significant hydrology and water quality effects as defined in <br /> CEQA Guideline section 15162(a). <br /> Land Use and IS/MND <br /> Planning Page 3-29 NI No - No No Yes <br /> IS/MND Discussion: <br /> The IS/MND concluded that the Proposed Project would not have any adverse or significant effects on land use or <br /> land use planning. Specifically,the Proposed Project would not result in a disruption,physical division,or isolation <br /> of existing residential or open space areas. The Proposed Project would not conflict with any applicable land use <br /> plan,policy,or regulation of an agency with jurisdiction over the Project area. The Proposed Project would also not <br /> conflict with the provisions of an adopted Habitat Conservation Plan, Natural Conservation Community Plan, or <br /> other approved local,regional,or state habitat conservation plan. As a result,no mitigation is necessary. <br /> IS/MND Mitigation Measures: <br /> • None identified or necessary. <br /> Project Change Discussion: <br /> The proposed changes to the Proposed would have the same impacts to land use and land use planning as the <br /> Original Proposed Project. The addition of 720 feet or 0.1 mile of new pipeline would not result in any new impacts <br /> as was evaluated in the 1S/MND. Also, the construction activities associated with the revised pipeline conveyance <br /> facilities would be substantially the same as they were originally described in the IS/MND as they would also be <br /> constructed within existing roadways, highly disturbed areas, and/or public right-of-ways. The Revised Proposed <br /> Project therefore would not have any incrementally significant land use and land use planning effects as defined in <br /> CEQA Guideline section 15162(a). <br /> December 2014 3-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.