Laserfiche WebLink
• <br /> City of Pleasanton Recycled Water Project <br /> CEQA Addendum <br /> Table 3 <br /> Environmental Review of Proposed Project Changes <br /> Do Proposed <br /> Changes Are Prior <br /> Involve Any New Mitigation <br /> What were the New Circumstances Measures <br /> Where Impact(s) Environmental Significant Involving New Any New Sufficient for <br /> were Analyzed Impact or Significant Information Addressing <br /> in conclusions for Substantially Impacts Requiring Any New <br /> Prior the Original More or Substantially New Potential <br /> Environmental Proposed Severe More Severe Analysis or Changes or <br /> Environmental Issue Area Documents. Project? Impacts? Impacts? Verification? Impacts? <br /> IS/MND Mitigation Measure: <br /> • Mitigation Measure GEO-1: Perform Geotechnical Investigation <br /> Project Change Discussion: <br /> The proposed changes to the Proposed Project would have the same impacts to geology and soils as the Original <br /> Proposed Project. The addition of 720 feet or 0.1 mile of new pipeline would not result in any new impacts to air <br /> quality as was evaluated in the IS/MND. Also, the construction activities associated with the revised pipeline <br /> conveyance facilities would be substantially the same as they were originally described in the IS/MND as they <br /> would also be constructed within existing roadways, highly disturbed areas, and/or public right-of-ways. The <br /> Revised Proposed Project therefore would not have any incrementally significant effects on geology and soils as <br /> defined in CEQA Guideline section 15162(a). <br /> Hazards and IS/MND <br /> Hazardous Pages 3-21 LTS/M No No No Yes <br /> Materials through 3-23 <br /> IS/MND Discussion: <br /> With the implementation of mitigation, the Proposed Project would not result in any residual significant and <br /> unavoidable impacts related to risks of upset or accidental release of hazards and hazardous materials. Therefore, <br /> project implementation would not result in any residual significant impacts related to hazards and hazardous <br /> materials. <br /> IS/MND Mitigation Measures: <br /> • Mitigation Measure HAZ-1: Store,Handle, Use Hazardous Materials in Accordance with Applicable Laws <br /> • Mitigation Measure HAZ-2: Properly Dispose of Contaminated Soil and/or Groundwater <br /> • Mitigation Measure HAZ-3: Properly Dispose of Hydrostatic Test Water <br /> • Mitigation Measure HAZ-4: Develop and Maintain Emergency Access Strategies <br /> Project Change Discussion: <br /> The proposed changes to the Proposed Project would have the same chances to cause a significant hazard to the <br /> public and/or the environment as the Original Proposed Project. The addition of 720 feet or 0.1 mile of new pipeline <br /> would not result in any new impacts as was evaluated in the IS/MND. Also, the construction activities associated <br /> with the revised pipeline conveyance facilities would be substantially the same as they were originally described in <br /> the IS/MND as they would also be constructed within existing roadways,highly disturbed areas,and/or public right- <br /> of-ways. The Revised Proposed Project therefore would not have any incrementally significant effects on the <br /> potential to cause a significant hazard to the public and/or the environment as defined in CEQA Guideline section <br /> 15162(a). <br /> Hydrology and IS/MND <br /> Water Quality Pages 3-24 LTS/M No No No Yes <br /> through 3-28 <br /> IS/MND Discussion: <br /> December 2014 3-6 <br />