Laserfiche WebLink
THE CITY OF <br /> ZiNg =1n II 1 II nits I�r_ <br /> pLEASANTONO <br /> Sewer System Management Plan <br /> The Sanitary Sewer Management Plan, prepared by the Operations Services Department, outlines and <br /> documents the activities that the City utilizes to manage its wastewater collection system effectively. <br /> Effective management of a collection system includes: <br /> • Minimizing the number and impact of sanitary sewer overflows (SSOs) <br /> • Providing adequate sewer capacity to convey peak flows, and <br /> • Maintaining and improving the condition of the collection system infrastructure to provide reliable <br /> service into the future. <br /> DOCUMENT ORGANIZATION <br /> This SSMP has been prepared by City of Pleasanton Department of Operations Services, Environmental <br /> Services Division staff in compliance with requirements of the San Francisco Bay Regional Water Quality <br /> Control Board (RWQCB) pursuant to section 13267 of the California Water Code. <br /> The SSMP is intended to meet the requirements of both the RWQCB and the Statewide General Waste <br /> Discharge Requirements (GWDR). <br /> The SSMP includes eleven elements as listed below. Each of these elements forms a section of this <br /> document. <br /> SSMP ELEMENTS <br /> 1. Introduction page 2 <br /> 2. Collection System Management Goals page 8 <br /> 3. Organization of Personnel, including the chain of command and communications page 10 <br /> 4. Legal Authority page 14 <br /> 5. Operations and Maintenance Program (Measures and Activities) page 16 <br /> 6. Design and Performance Provisions (Design and Construction Standards) page 21 <br /> 7.Overflow Emergency Response Plan page 22 <br /> 8. FOG Control Program page 34 <br /> 9. System Evaluation and Capacity Assurance Plan (Capacity Management) page 38 <br /> 10. Monitoring, Measurement and Plan Modifications page 40 <br /> 11.SSMP Program Audits page 42 <br /> 12. Communication Plan page 44 <br /> 11Page <br />