My WebLink
|
Help
|
About
|
Sign Out
ORD 2109
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
12/19/2014 1:39:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
12/16/2014
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2109
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. Where on-site fire hydrant(s) are required, they shall be installed, flushed and <br /> all valves open prior to any construction above the foundation or slab. This <br /> includes concrete tilt-up and masonry buildings. <br /> e. On-site fire hydrant(s) shall not be obstructed and shall be sufficiently above <br /> grade to have all hydrant valves and outlets accessible for emergency use. <br /> j. Prior to request for final inspection, all access roads, on-site access and fire <br /> hydrants shall be provided. All fire hydrants shall be acceptance inspected <br /> and tested to applicable City Public Works Standards. <br /> URBAN STORMWATER CONDITIONS OF APPROVAL <br /> 100. The project shall comply with the City of Pleasanton's Stormwater National <br /> Pollutant Discharge Elimination System (NPDES) Permit#CAS612008, dated <br /> October 14, 2009 and amendments (hereafter referred to as NPDES Permit). <br /> This NPDES Permit is issued by the California Regional Water Quality Control <br /> Board, San Francisco Bay Region (hereafter referred to as Regional Water <br /> Quality Control Board). Information related to the NPDES Permit is available at <br /> the City of Pleasanton Community Development Department, Engineering <br /> Division, and on line at: <br /> • http://www.ci.pleasanton.ca.us/business/planning/StormWater.html <br /> • http://www.waterboards.ca.gov/sanfranciscobay/water issues/programs/storm <br /> water/M u n icipa I/i n dex.shtm I <br /> A. Design Requirements <br /> A. NPDES Permit design requirements include, but are not limited to, the <br /> following: <br /> a. Source control, site design, implementation, and maintenance <br /> standards when a regulated project (such as a commercial and <br /> industrial project) creates and/or replaces 10,000 square feet or more <br /> of impervious surface, including roof area, street, and sidewalk. <br /> b. Hydro-modification standards when a regulated project creates and/or <br /> replaces a total impervious area of one acre or more. <br /> c. Compliance with a Diazinon pollutant reduction plan (Pesticide Plan) to <br /> reduce or substitute pesticide use with less toxic alternatives. <br /> d. Compliance with a Copper Pollutant Reduction Plan and a Mercury <br /> Pollutant Reduction Plan. <br /> B. The following requirements shall be incorporated into the project: <br /> PUD-100 Chick-fil-A <br /> Conditions of Approval (Planning Commission) Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.