My WebLink
|
Help
|
About
|
Sign Out
ORD 2109
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
12/19/2014 1:39:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
12/16/2014
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2109
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. The project developer shall submit a final grading and drainage plan, <br /> including stormwater treatment calculations, prepared by a licensed <br /> civil engineer depicting all final grades, onsite drainage control <br /> measures, and bio-retention swales. Irrigated bio-retention swales <br /> shall be designed to maximize stormwater entry at their most upstream <br /> point. The grading and drainage plans shall be subject to the review <br /> and approval of the City Engineer prior to the issuance of a grading or <br /> building permit, whichever is sooner. <br /> b. In addition to natural controls, the project developer may be required to <br /> install a structural control(s), such as an oil/water separator(s), sand <br /> filter(s), or approved equal(s) in the parking lot and/or on the site to <br /> intercept and pre-treat stormwater prior to reaching the storm drain. <br /> The design, location(s), and a schedule for maintaining the separator <br /> shall be submitted to the City Engineer/Chief Building Official for <br /> review and approval prior to the issuance of a grading or building <br /> permit, whichever is sooner. The structural control shall be cleaned at <br /> least twice a year (once immediately prior to October 15 and once in <br /> January). <br /> c. The project developer shall submit to the City Engineer the sizing <br /> design criteria and calculations for a hydromodification facility, if <br /> required, and for the treatment of stormwater runoff. The design <br /> criteria and calculations shall be subject to the review and approval of <br /> the City Engineer and shall be submitted prior to the issuance of a <br /> grading or building permit, whichever is sooner. <br /> d. Buildings/structures shall be designed to minimize the occurrence and <br /> entry of pests into buildings, thus minimizing the need for pesticides, <br /> as determined by the Chief Building Official prior to the issuance of a <br /> building permit. <br /> e. The project's landscape and irrigation plans shall be designed to: 1) <br /> minimize the use of fertilizers and pesticides that can contribute to <br /> stormwater pollution; and 2) promote surface infiltration. Prior to the <br /> installation of project landscaping and irrigation, the project landscape <br /> architect shall submit a landscaping and irrigation plan to the City <br /> Engineer for review and approval and submit written verification stating <br /> the project incorporates the following: <br /> i. Plants tolerant of saturated soil conditions and prolonged exposure <br /> to water in areas that provide detention of water. <br /> ii. Plants and soil amendments appropriate to site specific <br /> characteristics such as topography and climate. <br /> PUD-100 Chick-fil-A <br /> Conditions of Approval (Planning Commission) Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.