My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
100714
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2015 1:43:44 PM
Creation date
9/30/2014 4:13:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/7/2014
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
79. In accordance with measure AQ-3.1, the applicant shall employ measures as <br /> described within Operational Air Emissions Plan included as Exhibit B. <br /> 80. In accordance with measure BIO-5.1, prior to the beginning of tree removal or <br /> mass grading, between February 15 and August 15, including grading for major <br /> infrastructure improvements, an avian nesting survey shall be conducted of all <br /> habitat within 350 feet of any grading or earthmoving activity. The survey shall <br /> be conducted by a qualified biologist, as determined by the City, and occur no <br /> more than 21 days prior to disturbance. If no active nests are found, no further <br /> action is required. <br /> If active nests for special status avian species or raptor nests are found within <br /> the construction footprint, construction activities shall be delayed within a <br /> minimum 500-foot buffer zone surrounding active raptor nests and a minimum <br /> 250-foot buffer zone surrounding nests of other special status avian species until <br /> the young have fledged. This buffer zone shall not extend beyond the Staples <br /> Ranch site. The appropriate buffer can be modified by the City in consultation <br /> with qualified biologists and the California Department of Fish and Wildlife <br /> (CDFW). No action other than avoidance shall be taken without CDFG <br /> consultation. Completion of the nesting cycle shall be determined by a qualified <br /> ornithologist or biologist, as determined by the City. <br /> The buffer zone shall be delineated by highly visible temporary construction <br /> fencing, and no intensive disturbance (e.g., heavy equipment operation <br /> associated with construction, use of cranes or draglines, new rock crushing <br /> activities) or other project related activities that could cause nest abandonment <br /> or forced fledging, shall be initiated within the established buffer zone of an <br /> active nest. <br /> If the project is built in phases, this condition of approval shall be implemented <br /> for each phase of development. <br /> 81. In accordance with measure HZ-2.1, prior to initiation of any on-site <br /> construction activities, the project developer shall contact the Underground <br /> Service Alert (USA) whose purpose is to receive planned excavation reports <br /> from public and private excavators and to transmit those planned excavation <br /> reports to all participating excavation. The USA will contact local utilities and <br /> inform them that construction is about to begin in their service area. This notice <br /> allows local utilities to mark the areas where their underground facilities are <br /> located near the construction site so that they may be avoided during project <br /> construction. <br /> 82. In accordance with measure HZ-2.1, prior to construction activities within 50 feet <br /> of the PG&E gas line, the project contractor shall identify and demarcate the <br /> location of the natural gas pipeline using highly visible markers that will <br /> remain in place throughout project construction in the vicinity of the pipeline <br /> PUD-106, Chrylser-Jeep-Dodge Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.