My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
100714
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2015 1:43:44 PM
Creation date
9/30/2014 4:13:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/7/2014
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. The foot candle level for the remainder of the project site shall not <br /> exceed 10.0 foot candles as measured at ground level, except: <br /> o In approved designated display areas where <br /> merchandise is presented to customers, the foot candle level <br /> may be up to, but not exceed, 30.0 at ground level; and <br /> o At the senior continuing care community, foot candle spill <br /> over from the project site shall not exceed 1.0 foot candle at <br /> ground level. <br /> iii. Lighting fixtures for automobile sales and services shall not exceed <br /> 25 feet in height for ground mounted poles. <br /> b. During non-operational evening hours, all exterior parking lot lighting <br /> levels shall be designed such that they do not exceed 10 foot candles. <br /> 77. In accordance with measure VQ-3.3, all interior lighting shall be turned off during <br /> non-operational evening hours, with the exception of lighting needed for security <br /> reasons. <br /> 78. In accordance with measure AQ-2.1, the applicant shall implement the following <br /> mitigation measures during all construction phases to reduce impacts associated <br /> with construction dust to the extent feasible, as determined by the City Engineer. <br /> These measures shall be incorporated into the construction documents <br /> describing procedures and specifications for contractors to follow. <br /> a. Water all active construction areas at least twice daily. <br /> b. Cover all trucks hauling soil, sand, and other loose materials to or from the <br /> Project Area or require all trucks to maintain at least two feet of freeboard. <br /> c. Pave, apply water three times daily, or apply (non-toxic) soil stabilizers on all <br /> unpaved access roads, parking areas and staging areas at construction sites. <br /> d. Sweep daily (with water sweepers) all paved access roads, parking areas and <br /> staging areas at construction sites. <br /> e. Sweep streets daily (with water sweepers) if visible soil material is carried <br /> onto adjacent public streets. <br /> f. Hydroseed or apply (non-toxic) soil stabilizers to inactive construction areas <br /> (previously graded areas inactive for ten days or more). <br /> g. Enclose, cover, water twice daily or apply (non-toxic) soil binders to exposed <br /> stockpiles (dirt, sand, etc.). <br /> h. Limit traffic speeds on unpaved roads to 15 mph. <br /> i. Install sandbags or other erosion control measures to prevent silt runoff to <br /> public roadways. <br /> j. Replant vegetation in distributed areas as quickly as possible. <br /> k. Suspend excavation and grading activities to the extent feasible when <br /> instantaneous wind gusts exceed 25 mph. <br /> I. Limit, to the extent feasible, the number of areas adjacent to residences <br /> subject to excavation, grading and other construction activity at any one time. <br /> PUD-106, Chrylser-Jeep-Dodge Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.