Laserfiche WebLink
146. All retaining walls along the street shall be placed behind the Public Service <br />Easement (PSE), unless otherwise approved by the City Engineer. <br />147. A water meter shall be provided to each lot of record within the development <br />unless otherwise approved by the City Engineer. <br />148. A sanitary sewer lateral with two -way cleanout (located at the back of the <br />sidewalk or curb, whichever is applicable) shall be provided to each lot of record <br />within the development unless otherwise approved by the City Engineer. <br />149. A stub for each dry utility (electric power, gas, communication service, Cable <br />television, street lights and any required alarm systems) shall be provided to <br />each lot of record within the development unless otherwise approved by the City <br />Engineer. <br />150. All existing septic tanks or holding tanks, if any shall be properly abandoned, <br />pursuant to the requirements of the Alameda County Department of Health <br />Services prior to the start of grading operations, unless specifically approved by <br />the City Engineer. <br />151. This approval does not guarantee the availability of sufficient water and /or sewer <br />capacity to serve new developments on the project. <br />152. All dry utilities (electric power distribution, gas distribution, communication <br />service, Cable television, street lights and any required alarm systems) required <br />to serve existing or new development shall be installed in conduit, underground <br />in a joint utility trench unless otherwise specifically approved by the City <br />Engineer. <br />153. The encroachment permit for haul route for all materials and equipment to and <br />from this development shall be approved by the City Engineer prior to the <br />issuance of any permit by City Building Division or Engineering Division. <br />154. Any damage to existing street improvements during construction on the subject <br />property shall be repaired to the satisfaction of the City Engineer at full expense <br />to the project developer. This shall include slurry seal, overlay, or street <br />reconstruction if deemed warranted by the City Engineer. <br />Fire <br />155. All construction shall conform to the requirements of 2013 California Fire Code <br />and City of Pleasanton Ordinance No. 2083. All required permits shall be <br />obtained prior to work commencement. <br />156. Should any operation or business activity involve the use, storage or handling of <br />hazardous materials, the firm shall be responsible for contacting the LPFD prior <br />PUD -106, Chrylser- Jeep -Dodge Page 28 <br />