Laserfiche WebLink
137. Campers, trailers, motor homes, or any other similar vehicle are not allowed on <br />the construction site except when needed as sleeping quarters for a security <br />guard. <br />138. A construction trailer shall be allowed to be placed on the project site for daily <br />administration /coordination purposes during the construction period. <br />139. Portable toilets used during construction shall be kept as far as possible from <br />existing residences and shall be emptied on a regular basis as necessary to <br />prevent odor. <br />Engineering <br />140. A "Conditions of Approval" checklist shall be completed and attached to all plan <br />checks submitted for approval indicating that all conditions have been satisfied. <br />141. A parcel map shall be required to subdivide the property into 3 lots. With the <br />map, the project developer shall set forth the maintenance areas of the 3 Lots <br />proposed development and maintenance responsibilities. The project developer <br />shall record Maintenance Agreement at the time of recordation of the map. The <br />Maintenance Agreement shall be subject to the review and approval of the City <br />Attorney, Project Planner and the Utility Engineer prior to recordation of the map. <br />The Maintenance Agreement shall include but not limited to the maintenance of <br />all private utilities, the common access driveway, and other common areas not <br />within the area of a dedicated public street and facilities on the site. The project <br />Maintenance Agreement shall include exhibits showing the location of all the <br />common private improvements to be maintained. The City shall be granted the <br />rights and remedies but not the obligation, to enforce the maintenance <br />responsibilities. <br />142. Storm water shall not flow from one lot to the other unless a storm drain <br />easement created. Said easement shall be subject to the review and approval <br />by the City Engineer. <br />143. The project developer shall create private storm drainage easements as <br />necessary across the project for the benefit of the individual lots, subject to the <br />review and approval of the City Engineer. <br />144. The project developer shall create public service easements (PSE), private utility <br />easements, and other easements as necessary across the project for the benefit <br />of the individual lots, subject to the review and approval of the City Engineer. <br />145. The project developer shall post with the City, prior to approval of the parcel map, <br />a separate labor and material bond, performance bond and maintenance bond <br />for the full value of all subdivision improvements. This bond shall be in a standard <br />form approved by the City Attorney and shall be in an amount satisfactory to the <br />City Engineer. <br />PUD -106, Chrylser- Jeep -Dodge Page 27 <br />