My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
090214
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2015 4:56:04 PM
Creation date
8/27/2014 4:43:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/2/2014
DESTRUCT DATE
15Y
DOCUMENT NO
8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton <br /> Phase 1A Recycled Water Distribution System Design Final Draft <br /> Subtask 5.2 Assumptions: <br /> • Feasibility Study alternative will stand as is(not refined) <br /> • Trenchless alternative will be developed to a conceptual level of detail for appropriate analysis in <br /> the evaluation <br /> • If City selects trenchless alternative City will authorize Alternative Services Task 9B <br /> Subtask 5.2 Deliverables: <br /> • Draft TM in .pdf format via email and prior to the design criteria workshop <br /> Subtask 5.3: Prepare Design Study Report <br /> Consultant shall prepare the design study report, which shall include the following: <br /> 5.3.1 Design criteria including,but not be limited to: <br /> • basis for alignment selection <br /> • recommended pipe materials <br /> • pipeline sizing and design flow and pressure requirements by reach <br /> • pipeline appurtenance design criteria and sketches,including Title 22 identification requirements <br /> • pipeline bridge support structural design criteria per 2013 California Building Code if the <br /> Feasibility Study alignment across the Hopyard Road bridge over the Arroyo Mocho crossing is <br /> retained <br /> • methods of construction especially at channel and major road crossings <br /> • outline of typical on-site retrofit requirements and criteria per Title 22 for City use in planning <br /> customer connections <br /> • summary of CEQA mitigation measures for incorporating into the contract documents <br /> • summary of required permits <br /> • traffic management requirements and traffic control plans <br /> 5.3.2 Pipeline layout plan drawings at 40 scale using City GIS as base map and without supplemental <br /> survey data. Major existing utilities will be identified and the proposed alignment of the Project pipeline <br /> will be shown relative to existing improvements (curb, road centerline, etc.). Layout drawing will not <br /> include profiles. <br /> 5.3.3 Control valve station conceptual layouts, design criteria and preliminary equipment selection for <br /> both DSRSD and Livermore supplies. <br /> 5.3.4 Channel culvert pipe support design concepts and criteria. <br /> 5.2.5 Hopyard Road bridge crossing support design concepts and criteria, including bridge structural <br /> adequacy assessment. This would be performed only if City elects to proceed with the Feasibility Study <br /> alignment alternative for the Arroyo Mocho crossing. Evaluation will be limited to the capacity of the <br /> bridge to support the static and dynamic loads associated with hanging the recycled water pipeline from <br /> the bridge, including assessing impact of pipe penetrations on existing bridge structure abutments and <br /> bents, and beams. Consultant will rely upon bridge structural design information provided by the City. <br /> Consultant will meet with City staff to discuss the methodology of the assessment and to identify other <br /> constraints associated with using the bridges to support the pipeline. <br /> 5.3.6 System control strategy and communication requirements, including schematic diagrams will be <br /> developed for implementation by the City. <br /> Scope of Work Revs Page 9 of 17 <br /> August 20,2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.