Laserfiche WebLink
BACKGROUND <br /> Main Street Green Park — also known as "Arroyo Green at Main" — is a small, .75-acre <br /> site located at the corner of Vervais Avenue and Main Street at the northern entrance to <br /> downtown Pleasanton. Only about half of the total park site is currently developed, <br /> containing an informal turf area, large trees, and a small brick plaza with a bench and a <br /> drinking fountain. The remaining portion of the park, approximately 30,000 square feet, <br /> is undeveloped. <br /> The Park was one of several downtown parks and trails which were addressed in the <br /> Downtown Parks and Trails System Master Plan (DPTS) adopted initially by the City <br /> Council in 2002 and later included as part of the Downtown Specific Plan. In that <br /> document, Main Street Green Park was envisioned to be a site for modest recreation, <br /> both active and passive, as a recognizable entry to the downtown area and as the <br /> eastern trailhead for the Centennial Trail, which follows the Arroyo Del Valle. An <br /> excerpt from the 2002 DPTS which addresses Main Street Green Park is included as <br /> Attachment 2. <br /> In 2013, representatives from Pleasanton's three Rotary clubs approached the City with <br /> an idea and a donation to commemorate Rotary's 50th Anniversary in Pleasanton in May <br /> 2015. Included in those discussions were plans to renovate Main Street Green <br /> including the installation of a clock tower and the possible renaming of the park site or <br /> entrance plaza in recognition of the Rotary's many contributions to the community in <br /> general and specifically, to this park site. <br /> As a follow up to these discussions, earlier this year the City hired Keller Mitchell and <br /> Company to prepare a schematic park plan for the park and as part of the design and <br /> process, staff engaged the public, the Design Committee of the Pleasanton Downtown <br /> Association (PDA) and the Parks and Recreation Commission to assist with developing <br /> the plan. While the PDA Design Committee indicated general approval of the draft <br /> design and expressed support for the project overall, it did recommend changes that <br /> were considered by the Parks and Recreation Commission. These changes included <br /> lighting for the bocce ball courts, additional benches, and consideration of <br /> improvements to the west side of Main Street across from the Main Street Green. The <br /> PDA Board supported the Schematic Park Plan. <br /> On June 12, 2014, the Parks and Recreation Commission reviewed the Schematic Park <br /> Plan (Attachment 1) and considered comments from the public and the PDA. As an <br /> outcome of that meeting, the Commission unanimously supported the proposed design <br /> and identified the following recommended changes/additions: <br /> • Add an additional drinking fountain to the east end of the Park near the proposed <br /> bocce ball courts. <br /> • Provide a "doggy litter pick-up station" near the trail-head to the Centennial Trail <br /> at the west end of the Park. <br /> • Consider the use of recycled water at this Park once it becomes available in the <br /> area. <br /> • Incorporate the existing "Rotary" bricks into the proposed plaza area. <br /> Page 2 of 5 <br />