Laserfiche WebLink
3) Storm drainage system: a private on-site <br /> storm drain system meeting the 100 year <br /> flood criteria of both the City and the <br /> ACFCD. <br /> <br /> 4) A schematic on-site utilities system <br /> indicating P.G.&E., Pacific Telephone, <br /> etc. in a joint trench configuration <br /> within or adjacent to interior roadways. <br /> <br /> 3. That the developer process a minor subdivision and have <br /> a parcel map and final map reviewed, approved and recorded. <br /> <br /> 4. That the developer dedicate to the City any required <br /> public service easements needed for maintenance of <br /> utility systems or emergency or public service access. <br /> <br /> 5. That the developer submit a building permit survey <br /> and a site development plan in accordance with the <br /> Survey Ordinance (Article 3, Chapter 3, Title II) and <br /> that these plans be approved by the City Engineer <br /> prior to issuance of a building permit. <br /> <br /> 6. That the site development p~an include all required <br /> information to design and construct site, grading', <br /> paving, and drainage. <br /> <br />7. That the paving sections for the parking and drive <br /> areas be designed on the basis of an R-Value Test <br /> and a Traffic Index to carry the anticipated traffic <br /> loads. This design shall be subject to the approval <br /> of the City Engineer. The minimum paving section. <br /> shall be 2" A.C. on 6" A.B. The minimum A.C. pavement. <br /> slope shall be 1%. <br /> <br />8. That all utilities required to serve this development <br /> be installed underground. <br /> <br />9. That the developer install street frontage improve- <br /> ments on Old Hopyard Road per ordinance and to the <br /> satisfaction of the City Engineerat any time in the <br /> development process of the 6.1 ac. parcel (including <br /> the Buttercup site) deemed necessary by the City. <br /> These improvements shall include but not necessarily <br /> limited to: grading, curb and gutters, sidewalk, <br /> paving, storm drains, sanitary sewer, water <br /> facilities, street lighting, underground utilities <br /> and traffic control devices. <br /> <br />10. That the developer's contractor obtain an encroachment <br /> permit from the City prior to construction. <br /> <br /> <br />