Laserfiche WebLink
V <br /> Mr. Mike lessen() <br /> ,� <br /> March h 25,Pleasanton 014 <br /> March 25,2014 <br /> S S Page 4 <br /> B k F pavement delineation. The effort associated with the incorporation of the cited comments <br /> received after the encroachment permit,preparation of an amendment or CCO,and processing for <br /> an encroachment permit rider is estimated at $16,500. A re-analysis of the traffic operations of <br /> the signal at the Bema1/1-680 SB off-ramp was prepared by Hexagon Consultants dated February <br /> ENGINEERS 14, 2014. This extra work by Hexagon was performed outside this contract and the cost of this <br /> SURVEYORS work is not included in this contract amendment. <br /> PLANNERS The City performed a review of the bid set and issued verbal comments on February 18, 2014 <br /> relating to storm water treatment. This required additional coordination and conference call to <br /> discuss and resolve and is estimated at $1,500. It is not currently known if revisions to contract <br /> documents are required, so are excluded from this scope of work and are considered extra work. <br /> Construction Staking <br /> At the-City's request, BKF has prepared a construction staking scope for the Project. For the <br /> construction staking scope,BKF offers the following services: <br /> Demo/Sawcut Staking <br /> BKF will provide one set of stakes to be used for demolition and saw-cutting. These <br /> stakes will be set at a predetermined offset along the edge of the demolition/saw-cut <br /> lines. The accuracy of the stakes will be to the nearest tenth of a foot. The demo stakes <br /> will be provided in accordance with the stages identified in the project plans. Estimated <br /> cost of demo/sawcut staking is.$1,800. <br /> Rough Grade Staking <br /> BKF will provide one set of stakes to be used for rough grading of the roadway. These <br /> stakes will be set at a predetermined offset to the face of curb and located in a manner to <br /> allow grading of the high and low points. The accuracy of the stakes will be to the nearest <br /> tenth of a foot and are intended to be used for rough grading of these areas. In addition, <br /> all stakes will be marked with cut/fill information to the top of curb or finish grade: BKF <br /> has budgeted three (3) mobilizations to complete this staking task. Estimated cost of <br /> rough grade staking is $6,400. <br /> Finish Grade Staking <br /> BKF will be provided at a predetermined offset to the face of curb to be used for final <br /> grading and construction of the curbs, barriers, ADA ramps, gutters and walks. These <br /> stakes will be set at approximate 50-foot intervals along tangents and at approximate 25- <br /> foot intervals through curves. In addition, stakes will be set at all islands, bio-retention <br /> planters,raised islands, grade breaks,radius points and angle points. Information on each <br /> stake will include the elevation of each point and cut/fill information to the top of curb. <br /> BKF has budgeted four(4)mobilizations to complete this staking task Estimated cost of <br /> finish grade staking is$8,200. <br /> 4670 O® CCM <br /> ®250 <br /> mil unua nnr. m <br /> 94588 <br /> 1ID925-396.7700 <br /> 111113925496.7799 <br /> EED .weum <br />