Laserfiche WebLink
Mr.Mike Tassano <br /> ®� <br /> City March Pleasanton,2014 <br /> March 25,2014 <br /> B Page 5 PIM <br /> B I( F Storm Drain. Electroliers,and Traffic Signals Staking <br /> BKF will provide stakes for the installation of the main storm drain,inlets, electroliers, <br /> traffic signals and poles as shown on the civil plans. These stakes will be placed at <br /> ENGINEERS approximately 50-foot intervals and will include cut information to the invert of the storm <br /> SURVEYORS drain. Stakes will also include cut/fill information to the rim of the storm drain manholes <br /> and top of curb grades at the inlets. BKF has budgeted three (3) mobilizations to <br /> PLANNERS complete this staking task Estimated cost of storm drainage, electroliers, and traffic <br /> signal staking is$3;400. <br /> BKF can perform the construction staking work described above at an estimated cost of <br /> $19,800. The estimated fee is for one set of stakes with the corresponding cut sheets and daily <br /> logs. Stakes requested and subsequently lost will be considered as re-staking if asked to be <br /> replaced. Additional mobilizations if requested will also be considered extra work. Construction <br /> staking will be performed in accordance with Caltrans Construction Survey Manual dated <br /> November 2012 or as mutually agreed upon with Contractor. <br /> Construction Staking Exclusions <br /> The following items are specifically excluded from this proposal. If sufficient time is given, fees <br /> for these items will be provided prior to start of services. <br /> I. Project meetings. <br /> 2. Topography checks and calculations of quantities for site balance or removals. <br /> 3. Any Re-staking or extra staking,beyond the scope listed above.. <br /> 4. Prints&Reimbursable expenses will be billed at cost plus 10%,and are not a part of this <br /> agreement.. <br /> 5. Any checking of forms prior to concrete pours.. <br /> 6. Any as-builts of the site improvements. <br /> If re-staling or additional services are required after the Surveyor has set the proposed stakes as <br /> indicated in the proposal,the client will assume the cost of said re-staking. Service designated as <br /> extra will be billed at Surveyors hourly rates per the prevailing BKF Engineers rate schedule <br /> attached. <br /> It is understood whenever the Contractor on the job needs survey staking services done,they will <br /> make an attempt to schedule such services in 4-hour increments per scope item in order to reduce <br /> unnecessary travel time. They will also attempt to provide the Surveyor with a minimum of 48- <br /> hour notice before such service is to be performed.. <br /> 4670 0® <br /> ®250 <br /> ■iuiuniti a l=] <br /> 94588 <br /> E D 925.396.7700 <br /> 0110925.396.7799 <br /> (.aimlilt <br />