My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
052014
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 4:27:44 PM
Creation date
5/14/2014 3:55:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2014
DESTRUCT DATE
15Y
DOCUMENT NO
5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
facilities, and also the second-story portion of the parts storage. The exterior of <br /> the second floor of the building will be rooftop parking for service vehicles. <br /> • Ramp, Car Wash, Equipment Storage, and Trash Enclosure: The proposed <br /> car wash, equipment, storage, and trash enclosure is detached from the sales <br /> and service building, but a ramp on the second floor of this building provides <br /> access to the rooftop parking area of the sales and service building. <br /> • Design and Architecture: The design and architecture of the proposed <br /> showroom and service facility incorporates current Lexus corporate standards. <br /> Color renderings and elevations are part of the project plans, Exhibit B, and are <br /> attached to this staff report. A color and materials board will be available at the <br /> hearing for the City Council's review. <br /> PLANNING COMMISSION ACTION <br /> The Planning Commission held a public hearing on April 23, 2014, to review the <br /> proposed project. As noted in the meeting minutes, the project was approved by a 4-0 <br /> vote. <br /> DISCUSSION <br /> The attached Planning Commission staff report (Attachment 4) presents a more <br /> thorough discussion of the project, including: General Plan conformity, zoning and <br /> uses, site plan, floor-area-ratio, building height, landscaping, building design, fire <br /> department access, parking and circulation, noise, grading and drainage, lighting, <br /> Green Building, and the conformity with the Climate Action Plan. <br /> PUD FINDINGS <br /> Please refer to pages 18-20 of the attached Planning Commission staff report for a <br /> discussion of the considerations needed to approve the proposed PUD development <br /> plan. <br /> PUBLIC NOTICE <br /> Notice of the proposed project and related City Council public hearing was sent to all <br /> property owners in Pleasanton that are within 1,000 feet of the subject site (the noticing <br /> area is depicted on the noticing maps attached to this report as Attachment 4, Exhibit <br /> E), and was also published in the local newspaper. Staff has not received any <br /> comments as of the publication of this report, and will forward to the City Council any <br /> public comments received after publication of this report. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.