Laserfiche WebLink
PROJECT DESCRIPTION <br /> The project proposal consists of the demolition of the four buildings on the subject site <br /> and the construction of an approximately 83,300-square-foot showroom and service <br /> facility (inclusive of an approximately 3,250-square-foot car wash, trash enclosure, and <br /> storage area) for Lexus of Pleasanton. A canopy for detailing is proposed near the <br /> south-eastern corner of the site. The two driveways on Rosewood Drive would remain <br /> as they currently exist. The landscaping plan in Figure 2 shows the footprint of the <br /> proposed sales and service building and car wash. <br /> Hendrick Automotive Group plans to operate the Lexus dealership at the subject site <br /> during construction by phasing demolition. The first phase will consist of the demolition <br /> of the Infiniti and Volvo buildings and construction of the service area in the new <br /> building, the roof-top parking, and car wash facility, which allows operations to continue <br /> in the current Lexus facility. The second phase will consist of the demolition of the <br /> existing Lexus sales and service building and construction of the new showroom and <br /> sales area of the building. The Acura dealership is not part of the project. <br /> The project characteristics are outlined below Figure 2. Additional details can be found <br /> in the Planning Commission staff report (Attachment 4).• <br /> ehic1e- J Sib:. <br /> �I` d <br /> @ntoryan•. / . <br /> for•` ES 4) <br /> 4'-- •'eh` 4_ Proposed Building <br /> an orage . 0M; <br /> _ JIM :t N N <br /> .k : <br /> FIGURE 2: Proposed Landscaping Plan <br /> • Floor Plan: The first floor of the new building will consist of a reception area and <br /> showroom, customer lounge, parts storage, office areas, restroom facilities, a <br /> boutique for vehicle accessory sales, areas for service advisors, and a café area. <br /> A total of 61 service bays are proposed (there are currently 35 service bays). <br /> The interior of the second floor will consist of general offices and employees <br /> Page 3 of 5 <br />