Laserfiche WebLink
33. The applicants shall install evergreen trees (including Coast Live Oaks) and/or shrubs <br /> and/or vines or other landscaping to help screen the views of the retaining walls from <br /> off-site areas. A landscape plan shall be included with the subdivision improvement <br /> plans and shall be subject to the review and approval by the Director of Community <br /> Development, with input from the Silver Oaks Lane HOA. The applicants shall utilize <br /> plants that are appropriate for the soil and water conditions and that look appropriate <br /> in a grassland and/or oak woodland setting. In addition, plant species shall be a <br /> drought tolerant nature with an irrigation system that maximizes water conservation <br /> (e.g. drip system). <br /> Section 2: Changes and Additions to be discussed by the City Council <br /> 5. Prior to the recordation of the Final Parcel Map, the applicants shall create a <br /> maintenance agreement including the maintenance responsibility of the driveway, <br /> retaining walls, common landscaping, electronic gate, bio-retention area, utilities, <br /> storm water treatment system, etc. in perpetuity. The maintenance agreement is <br /> subject to review and approval by the City Attorney's Office and shall be recorded <br /> concurrently with the Final Parcel Map. The Maintenance Agreement shall include <br /> exhibits showing the location of all the common private improvements to be <br /> maintained. The City shall be granted the rights and remedies of the agreement, but <br /> not the obligation, to enforce the maintenance responsibilities of the agreement. <br /> 14. The design of the future homes on Lot 1 and Lot 2 shall be subject to the design <br /> criteria specified in the Silver Oaks Hillside Lots Subdivision Parcels 1 and 2 Site <br /> Development and Architectural Review Guidelines in Exhibit B. The design guidelines <br /> shall be revised to include the following and are subject to review and approval by <br /> Community Development Director prior to recordation of the final parcel map: <br /> a. Photosimulations are required as part of the design review application for the <br /> future homes on Lot 1 and Lot 2. <br /> b. Building height is measured vertically from the lowest elevation of the building <br /> to the highest elevation of the building, excluding chimneys. The "lowest <br /> elevation of the building" is the lowest finished grade adjacent to an exterior wall <br /> of the main house. <br /> c. The maximum building height for Lot 1 is 40 feet as measured from the "down <br /> slope" side. <br /> d. The maximum building height for Lot 2 is 30 feet. <br /> e. Modification to the building pad elevation(s) may require a modification to the <br /> PUD development plan as determined by the Director of Community <br /> Development. <br /> f. Alternative 1 site layout needs to be included in the guidelines. <br /> g. Lot 1 and Lot 2 shall be limited to a maximum of 7,000 square feet of habitable <br /> space. <br /> 18. Prior to completion of the private access road, the applicant shall install an electronic <br /> pate at the entrance to the access road. The design and location of the gate shall be <br /> subiect to review and approval by the Director of Community Development. <br />