My WebLink
|
Help
|
About
|
Sign Out
22 ATTACHMENT 01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
041514
>
22 ATTACHMENT 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 3:38:11 PM
Creation date
4/4/2014 1:50:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/15/2014
DESTRUCT DATE
15Y
DOCUMENT NO
22 ATTACHMENT 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Construction Requirements <br /> The project shall comply with the "Construction General Permit" requirements of the <br /> NPDES Permit for construction activities (including other land disturbing activities) <br /> that disturb one acre or more (including smaller sites that are part of a larger <br /> common plan of development). <br /> Information related to the Construction General Permit is on line at: <br /> • http://www.waterboards.ca.gov/water_issues/programs/stormwater/construction <br /> .shtml <br /> • http://www.waterboards.ca.gov/water issues/programs/stormwater/docs/finalco <br /> nstpermit.pdf <br /> 1. The Construction General Permit's requirements include, but are not limited to, <br /> the following: <br /> a. The applicants shall obtain a construction general permit (NOI) from the <br /> Regional Water Quality Control Board to discharge stormwater, and to <br /> develop and implement stormwater pollution prevention plans. <br /> b. The applicants shall submit a Stormwater Pollution Prevention Plan (SWPPP) <br /> to the City Engineer/Chief Building Official for review and approval prior to the <br /> issuance of a grading or building permit, whichever is sooner. A copy of the <br /> approved SWPPP, including all approved amendments, shall be available at <br /> the project site for City review until all engineering and building work is <br /> complete and City permits have been finaled. A site specific SWPPP must be <br /> combined with proper and timely installation of the BMPs, thorough and <br /> frequent inspections, maintenance, and documentations. SWPPP for projects <br /> shall be kept up to date with the projects' progress. Failure to comply with the <br /> most updated construction SWPPP may result in the issuance of correction <br /> notices, citations, and/or stop work orders. <br /> c. The applicants are responsible for implementing the following Best <br /> Management Practices (BMPs). These, as well as any other applicable <br /> measures, shall be included in the SWPPP and implemented as approved by <br /> City. <br /> i. The applicants shall include erosion control/stormwater quality <br /> measures on the project grading plan which shall specifically address <br /> measures to prevent soil, dirt, and debris from entering the public <br /> storm drain system. Such measures may include, but are not limited <br /> to, hydroseeding, hay bales, sandbags, and siltation fences and shall <br /> be subject to the review and approval of the City Engineer/Chief <br /> Building Official. If no grading plan is required, necessary erosion <br /> PUD-84, Berlogar Page 13 of 22 City Council <br />
The URL can be used to link to this page
Your browser does not support the video tag.