My WebLink
|
Help
|
About
|
Sign Out
22 ATTACHMENT 01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
041514
>
22 ATTACHMENT 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 3:38:11 PM
Creation date
4/4/2014 1:50:56 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/15/2014
DESTRUCT DATE
15Y
DOCUMENT NO
22 ATTACHMENT 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. Plants and soil amendments appropriate to site specific characteristics <br /> such as topography and climate. <br /> iii. Landscaping and irrigation consistent with Bay-Friendly Landscaping. <br /> iv. Water conservation techniques to promote surface infiltration. <br /> f. All paved outdoor storage areas shall be designed to minimize pollutant <br /> runoff. Bulk materials stored outdoors that may contribute to the pollution of <br /> stormwater runoff must be covered as deemed appropriate by the City <br /> Engineer/Chief Building Official. <br /> g. All metal roofs, gutters, and downspouts shall be finished with rust-inhibitive <br /> finish/paint as determined by the Chief Building Official. <br /> h. All projects using architectural copper roofing, gutters, downspouts, etc., shall <br /> utilize the following Best Management Practices for use and maintenance: <br /> a. During installation, copper material shall be pre-patinated at the <br /> factory. If patination is done on-site; collect the rinse water in a tank <br /> and haul off-site for disposal. With prior authorization from Dublin San <br /> Ramon Services District (DSRSD), you may collect the rinse water in a <br /> tank and discharge to the sanitary sewer. Optionally, consider coating <br /> the copper materials with a clear coating that prevents further <br /> corrosion and stormwater pollution. The clear coating, if utilized, shall <br /> be reapplied (as recommended by the coating manufacturer) to <br /> maintain its efficacy. <br /> b. During maintenance, the following applies during washing and <br /> patination: <br /> i. Minimize washing of architectural copper as it damages the <br /> patina and any protective coating. <br /> ii. Block all storm drain inlets downstream of the wash. <br /> iii. collect in a tank and dispose off-site, or discharge the wash <br /> water to the sanitary sewer (with prior authorization from <br /> DSRSD). <br /> c. During re-patination, collect the rinse water in a tank and dispose off- <br /> site or discharge to sewer (with prior authorization from DSRSD). <br /> i. Roof drains shall drain away from the building foundation. <br /> Stormwater flow shall drain to a landscaped area or to an <br /> unpaved area wherever practicable as determined by the City <br /> Engineer/Chief Building Official. <br /> PUD-84, Berlogar Page 12 of 22 City Council <br />
The URL can be used to link to this page
Your browser does not support the video tag.