Laserfiche WebLink
control/stormwater quality measures shall be shown on the site plan <br /> submitted for a building permit, and shall be subject to the review and <br /> approval of the Building and Safety Division. The applicants are <br /> responsible for ensuring that the contractor is aware of and implements <br /> such measures. <br /> ii. All cut and fill slopes shall be revegetated and stabilized after <br /> completion of grading, but in no case later than October 15. <br /> Hydroseeding shall be accomplished before September 15 and <br /> irrigated with a temporary irrigation system to ensure that the <br /> vegetated areas are established before October 15. No grading shall <br /> occur between October 15 and April 15 unless approved erosion <br /> control/stormwater quality measures are in place, subject to the <br /> approval of City Engineer/Chief Building Official. Such measures shall <br /> be maintained until such time as permanent landscaping is in place. <br /> iii. Gather all sorted construction debris on a regular basis and place in <br /> the appropriate container for recycling; to be emptied at least on a <br /> weekly basis. When appropriate, use tarps on the ground to collect <br /> fallen debris or splatters that could contribute to stormwater runoff <br /> pollution. <br /> iv. Remove all dirt, gravel, rubbish, refuse, and green waste from the <br /> street pavement and storm drains adjoining the site. Limit construction <br /> access routes onto the site and place gravel on them. Do not drive <br /> vehicles and equipment off paved or graveled areas during wet <br /> weather. Broom sweep the street pavement adjoining the project site <br /> on a daily basis. Scrape caked on mud and dirt from these areas <br /> before sweeping. <br /> v. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to <br /> retain any debris or dirt flowing in the storm drain system. Maintain <br /> and/or replace filter materials to ensure effectiveness and to prevent <br /> street flooding. <br /> vi. Create a contained and covered area on the site for the storage of <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on <br /> the site that have the potential of being discharged into the storm drain <br /> system by being windblown or by being spilled. <br /> vii. Never clean machinery, equipment, tools, brushes, or rinse containers <br /> into a street, gutter, or storm drain. <br /> PUD-84, Berlogar Page 14 of 22 City Council <br />