My WebLink
|
Help
|
About
|
Sign Out
22 ATTACHMENT 06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
041514
>
22 ATTACHMENT 06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 3:39:32 PM
Creation date
4/4/2014 1:29:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/15/2014
DESTRUCT DATE
15Y
DOCUMENT NO
22 ATTACHMENT 6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
developer shall pay any applicable Dublin San Ramon Services District <br /> (DSRSD) sewer permit fee. <br /> 47. This project is subject to its fair share of the cost of Fire Station No. 4 <br /> (Ruby Hill) and reimbursement shall be made as specified in the adopted <br /> Reimbursement Agreement between Signature Homes and the City of <br /> Pleasanton <br /> Miscellaneous Environmental Requirements <br /> 48. Prior to the demolition of any existing structure located on the subject <br /> properties, the project developer shall have the structures examined for the <br /> presence of bats; if found, the developer shall prepare an appropriate <br /> mitigation plan for review and approval by the Planning Director prior to <br /> any demolition work. <br /> 49. Prior to the demolition of any existing structure located on the subject <br /> properties, the project developer shall have the structures examined for the <br /> presence of lead, lead-based paint, and/or asbestos by a qualified <br /> environmental professional. If lead and/or asbestos are found to be present, <br /> demolition of these structures shall be conducted in accordance with the <br /> applicable requirements of the California Department of Industrial <br /> Relations (Cal-OSHA) for lead, and Cal OSHA and the Bay Area Air <br /> Quality Management Board (BAAQMD) for asbestos. The project <br /> developer shall provide to the Planning Director a follow-up report within <br /> thirty(30) days after demolition of the structures is completed. <br /> 50. The project developer acknowledges that the City of Pleasanton does not <br /> guarantee the availability of sufficient sewer capacity to serve this <br /> development by the approval of this case, and that the project developer <br /> agrees and acknowledges that building permit approval may be withheld if <br /> sewer capacity is found by the City not to be available. <br /> 51. This approval does not guarantee the availability of sufficient water to serve <br /> the project. The City shall withhold building permits for the project if at <br /> the time building permits are applied for, mandatory water rationing is in <br /> effect, unless the City has adopted a water offset program and unless the <br /> project developer is participating in the program. Notwithstanding the <br /> project developer's participation in such a program, the City may withhold <br /> building permits if the City determines that sufficient water is not available <br /> at the time of application of building permits. <br /> Conditions of Approval,PUD-5,Centex Homes'Apperson Ridge June 5.2001 <br /> Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.