My WebLink
|
Help
|
About
|
Sign Out
22 ATTACHMENT 02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
041514
>
22 ATTACHMENT 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 3:38:24 PM
Creation date
4/4/2014 1:01:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/15/2014
DESTRUCT DATE
15Y
DOCUMENT NO
22 ATTACHMENT 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 2 <br /> E B „ <br /> ENGINEEA1NG <br /> October 26,2012 <br /> Mr.Frank Berlogar <br /> 5587 Sunol Boulevard <br /> Pleasanton,CA 94566 <br /> RE: LANDFILL GAS ASSESSMENT REPORT <br /> 88 SILVER OAKS COURT„PLEASANTON,CALIFORNIA <br /> EBA JOB No. 124869(TASK 3) <br /> Dear Mr. Matt: <br /> This report presents the findings from a landfill gas(LFG)assessment perforated at the 88 Silver <br /> Oaks Court property (Property) located in Pleasanum, California. The LFG assessment was <br /> performed at the request of the City of Pleasturton, Engineering Department(City)as part of a <br /> • building permit requirement based on the Property's proximity to the Old Pleasanton Landfill <br /> (Landfill). The Property is currently in the planning stage for the development of two parcels <br /> that will include the construction of two single family dwellings. The building pads for the <br /> • dwellings will be•located approximately 250 to 400 feet east of the Landfill's waste footprint <br /> Thus„the purpose of the assessment was to establish iftEG is present on the Property in the area <br /> of the proposed building pads. The work was performed in general accordance with the Work <br /> Plan for Londfill Gas Assessmni (Work Pion) dated September 25, 2012 (EBA Engineering <br /> • [EBA),2012). The Work Plan was submitted to the City for review prior to implementation. <br /> SCOPE OF WORK <br /> Two(2)temporary LEG monitoring points(MP-1 and N1P-2)were installed on October 10,2012 <br /> under a permit from the one 7 Water Agency(Permit No 2012101)at the locations Shown on <br /> Figure 1 (Appendix A). As shown on Figure 1,one LEG monitoring point was installed on each <br /> parcel within or adjacent to the proposed building pads. The LEG monitoring points were <br /> installed by Britton Exploration of Los Gatos, California under the direct supervision of FBA. <br /> Drilling was performed using a track-mounted rotary auger drill rig equipped with 8-inch <br /> diameter hollow-stem augers. Soil samples were collected during the course of drilling at 5-foot <br /> intervals using a standard split-spoon sampler for the purpose of characterizing the lithology. In <br /> addition,the boreholes were monitored for methane at 5-foot intervals using a portable methane <br /> meter(RKI Eagle Series). Each soil tarring was logged and recorded by EI3A's field geologist. <br /> Copies of the corresponding soil boring logs are enclosed in Appendix B. <br /> I.*gene 60Ar.ptgerlirpon IQ 25 Jidx <br /> Sonoma Avenue,Suitt C • Santa Rois.71.CA hfortwa 954114 <br /> :707)544-0784 * FAX(707)544 <br /> OCT 3 0 2012 <br /> CITY OF PLEASANTON <br /> • PLANNING DIVISIQN <br />
The URL can be used to link to this page
Your browser does not support the video tag.