Laserfiche WebLink
PROJECT TITLE: CALLIPPE PRESERVE GOLF COURSE Page 1 <br /> Pleasanton, CA JMP Golf Design Group <br /> HOLE#14 GREEN RENOVATION BID SCHEDULE-Revised Nov 26, 2013 <br /> ITEM DESCRIPTION OF ITEM ESTIMATED UNIT UNIT AMOUNT <br /> NO. QUANTITY PRICE <br /> 1 Mobilization Lump Sum L.S. Lump Sum $ 750.00 <br /> 2 Layout and Staking Lump Sum L.S. Lump Sum $ 300.00 <br /> 3 Removal of Green Complex <br /> Turf Removal and Off-site Disposal 15,965 S.F. $ 0.65 $ 10,377.25 <br /> Green's Mix, Gravel & Pipe Removal&Transfer 6,440 S.F. $ 1.00 $ 6,440.00 <br /> 4 Removal of Bunker Sand 1,525 S.F. $ 0.40 $ 610.00 <br /> (Including Pipe and Gravel) <br /> 5 Shaping Green Complex Lump Sum L.S. Lump Sum $ 3,400.00 <br /> Includes transfer of import soil from on-site <br /> location(s)to green <br /> 6 Green Construction 6,810 <br /> USGA Construction w/o choker layer S.F. $ 6.25 $ 42,562.50 <br /> 7 Bunker Construction <br /> (New drainage, new grave • -nd, full liner) 1,525 S.F. $ 6.50 $ 9.912.50 <br /> Identify as StaLok o 4=etter Billy Bunke Circle one <br /> 8 Drain Inlets <br /> Re-Install Drain Inlets& Risers 2 EA $ 160.00 $ 320.00 <br /> Solid 4"ADS to Outfall-Allowance Est. 20 L.F. $ 10.00 $ 200.00 <br /> 9 Irrigation <br /> Re-install 5 Exist. Heads& Up to 3 New Heads 8 EA $ 250.00 $ 2.000.00 <br /> (Including New Pipe, Swing Joints and Wires, <br /> New Heads Owner Provided) <br /> Re-install valves and/or Re-set valve boxes 1 EA $ 150.00 $ 150 00 <br /> 10 Green 6,810 S.F. $ 0.22 $ 1.498.20 <br /> Finish Shaping/Amendments/Seedbed Prep. <br /> 11 Surrounds 9,155 S.F. $ Q.15 $ 1,373.25 <br /> Finish Shaping/Amendments/Seedbed Prep. <br /> 12 Bunker Edging 220 L.F. $ 1.00 $ 220.00 <br /> BASE BID-TOTAL OF ALL ELEMENTS $80.113.70 <br /> USING SCRIPT-$Eighty Thousand One Hundred Thirteen Dollars and Seventy Cents <br /> Company: D.H.R. C&.".1 uction Inc. Date: December 5th. 2013 <br /> Signature aotri /r Name/Title : Joy E. Ramos Vice President <br />