Laserfiche WebLink
Attachment A <br /> PROJECT TITLE: CALLIPPE PRESERVE GOLF COURSE Page 1 <br /> Pleasanton, CA JMP Golf Design Group <br /> HOLE#11 GREEN RENOVATION BID SCHEDULE -Revised Nov 26, 2013 <br /> ITEM DESCRIPTION OF ITEM ESTIMATED UNIT UNIT AMOUNT <br /> NO. QUANTITY PRICE <br /> 1 Mobilization Lump Sum L.S. Lump Sum $ 750.00 <br /> 2 Layout and Staking Lump Sum L.S. Lump Sum $ 300.00 <br /> 3 Removal of Green Complex <br /> Turf Removal and Off-site Disposal 18,325 S.F. $ 0.65 $ 11,911.25 <br /> Green's Mix, Gravel & Pipe Removal &Transfer 6,240 S.F. $ 1.00 $ 6,240.00 <br /> 4 Shaping Green Complex Lump Sum L.S Lump Sum $ 4.600.00 <br /> Includes export/transfer of excess soil to <br /> location(s)on-site <br /> 5 Green Construction 7,875 L.S. Lump Sum $ 49,218.75 <br /> USGA Construction w/o choker layer <br /> 6 Drain Inlets <br /> Re-Install Drain Inlets& Risers 3 EA $ 160.00 $ 480.00 <br /> Solid 4"ADS to Outfall-Allowance Est. 30 L.F. $ 10.00 $ 300.00 <br /> 7 Irrigation <br /> Re-install 10 Exist. Heads&up to 3 New Heads 13 EA $ 250.00 $ 3,250.00 <br /> (Including New Pipe, Swing Joints and Wires, <br /> New Heads Owner Provided) <br /> Re-install valves and/or Re-set valve boxes 1 EA $ 150.00 $ 150.00 <br /> 8 Green 7,875 S.F. $ 0.22 $ 1.732.50 <br /> Finish Shaping/Amendments/Seedbed Prep. <br /> 9 Surrounds 10,450 S.F. $ 0.15 $ 1.567.50 <br /> Finish Shaping/Amendments/Seedbed Prep. <br /> BASE BID-TOTAL OF ALL ELEMENTS $80,500.00 <br /> USING SCRIPT-$Eighty Thousand Five Hundred Dollars <br /> Company: D.H.R. Con uction Inc. Date: December 5th, 2013 <br /> Signature: /1,7410/I Name/Title : Joy E. Ramos Vice President <br />