Laserfiche WebLink
, <br /> PROJECT TITLE: CALLIPPE PRESERVE GOLF COURSE Page 1 <br /> Pleasanton, CA JMP Golf Design Group <br /> HOLE#10 FAIRWAY BUNKER RENOVATION BID SCHEDULE -Revised Nov 26, 2013 <br /> Add Alternate#2 <br /> ITEM DESCRIPTION OF ITEM ESTIMATED UNIT UNIT AMOUNT <br /> NO. QUANTITY PRICE <br /> 1 Mobilization Lump Sum L.S. Lump Sum $ 0.00 <br /> 2 Layout and Staking Lump Sum L.S. Lump Sum $ 200.00 <br /> 3 Removal of Bunker Sand 4,480 S.F. $ 0.40 $ 1,792.00 <br /> (Including Pipe and Gravel) <br /> 4 Turf Removal and Disposal Off-site 7,400 S.F. $ 0.65 $ 4,810.00 <br /> 5 Shaping&Grass Hollow Construction Lump Sum L.S. Lump Sum $ 4,800.00 <br /> 6 Bunker Construction <br /> (Including new drainage, new gravel, 2,520 S.F. $ 6.50 $ 16.380.00 <br /> new sand, full liner produc. <br /> Identify as StaLok or etter Billy Bunke <br /> Circle One <br /> 7 Drain Inlets <br /> Install New Drain Inlet& Riser 2 EA $ 280.00 $ 560.00 <br /> Solid 4"ADS to Outfall-Allowance Est. 100 L.F. $ 10.00 $ 1.000,00 <br /> 8 Irrigation <br /> Re-install 2 Exist. Heads&2 to 3 New Heads 5 EA $ 250.00 $ 1,250.00 <br /> ( Including New Pipe, Swing Joints and Wires, <br /> New Heads Owner Provided) <br /> 9 Finish Shaping/Amendments/Seedbed Prep. 8,550 S.F. $ 0.15 $ 1.282.50 <br /> 10 Bunker Edging 245 L.F. $ 1.00 $ 245.00 <br /> BASE BID-TOTAL OF ALL ELEMENTS $32,319.50 <br /> USING SCRIPT-$Thirty Two Thousand Three hundred Nineteen Dollars and Fifty Cents <br /> Company: D.H.R. CoRstruction Inc. Date: December 5th, 2013 <br /> Signature 'E 2,k,#: ---- -Name/Title :Joy E. Ramos Vice President <br /> 1 <br />