My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
020414
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 3:00:24 PM
Creation date
1/30/2014 3:38:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/4/2014
DESTRUCT DATE
15Y
DOCUMENT NO
7
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORKPLAN <br /> Additional Sections: FCS will provide the additional sccticns in the EIR to <br /> meet the CEQA Guidelines and City's requirements,including the following: <br /> Significant Unavoidable Adverse Impacts, Effects Found Not to be <br /> Significant,and Organizations and Persons Consulted/Bibliography. We will <br /> be responsible for the preparation of the following for each project:Table of <br /> Contents,Irreversible and Irretrievable Commitment of Resources,List of <br /> Organizations and Persons Consulted,Preparers of the Environmental <br /> Document,References,and Appendices. The EIR will include the necessary <br /> exhibits to enhance the written text and clarify the proposed project <br /> environmental impacts.This Task assumes electronic base rr:aps will be <br /> provided by the City. <br /> Subtask 8.5-Traffic 1 —Study Intersection identification <br /> Impact Analysis Our scope of work assumes the EIR will evaluate up to 15 external study <br /> intersections (including project site access locations),plus the major internal <br /> intersections. Based on trip generation, trip distribution patterns and <br /> comments received on the Notice of Preparation for the project,we will <br /> develop a final list of recommended study intersections. it is anticipated that <br /> the study intersections will primarily be in the immediate vicinity of the <br /> Specific Plan area as the Housing Element FIR analysis indicated that key <br /> intersections in the area would operate at acceptable service levels with <br /> buildout of the General Plan and approved Housing Element land uses. The <br /> final list of study intersections may include locations in Liveimore and <br /> Dublin. <br /> We have assumed that we will use data prepared for the Housing Element <br /> EIR work,supplemented by new morning(7:00 to 9:00 AAM`, and evening <br /> (4:00 to 6:00 PM) turning movement counts at up to 5 intersections,in <br /> addition to the 2 intersections where data was collected as part of the specific <br /> plan work. Traffic signal timings will be obtained from City staff and verified <br /> by field observations. Freeway operations will be evaluated t'►rough the <br /> Congestion Management Agency Assessment,detailed as part of Task 4. <br /> Deliverables:Fehr& Peers will document this information in a technical <br /> memorandum for the City to review. After their review,the final list of study <br /> intersections will be identified. <br /> 2—Impact Analysis <br /> The intersection peak hour level of service at each study intersection will be <br /> calculated using the 2000 Highway Capacity Manual method. As the El <br /> Charro Road extension is not necessarily proposed to be constructed as part <br /> of the Project,we have included as an optional task evaluating Project <br /> conditions both with and without the full connection between the Fallon <br /> Road interchange at I-580 and Stanley Boulevard. <br /> The impact analysis will be conducted for the following scenarios: <br /> Scenario 1:Existing Conditions— Existing volumes obtained from traffic <br /> counts and the existing roadway system configuration. <br /> Scenario 2: Existing Plus Project—Existing volumes obtained from traffic <br /> counts and the existing roadway system configuration plus traffic estimated <br /> for the Project. The roadway system is the same as Scenario 1. <br /> _.___._.._._._...___ GATES <br /> _. __........_..- _.._.____.._...... ♦ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.