My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2014
>
020414
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 3:00:24 PM
Creation date
1/30/2014 3:38:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/4/2014
DESTRUCT DATE
15Y
DOCUMENT NO
7
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORKPLAN <br /> to determine existing and future traffic noise exposure levels. with and <br /> without the project, for select roadway segments in the project vicinity. <br /> Traffic volume information (ADTs or peak-hour volumes) from the project <br /> traffic consultant will be required for this analysis. <br /> FCS will overlay select future (with Project) traffic noise con_ours on the <br /> project land use and Specific Plan graphic. In addition,we provide a <br /> general assessment regarding project-related construction and its impact on <br /> existing and future noise-sensitive receivers,including construction of the El <br /> Charro overpass. Based upon the results of the previous tasks,we will <br /> determine potential noise impacts associated with the proposed project and <br /> will develop mitigation measures to address these impacts in accordance with <br /> the City of Pleasanton noise ordinances and municipal code. <br /> Public Services: FCS will evaluate the proposed project's impacts on the <br /> public services in collaboration with the City staff,Police and Fire <br /> departments,and the Pleasanton Unified School District.Pleasanton has <br /> recently updated its Housing Element and is expanding its housing stock in <br /> compliance with a court order. As a result,careful coordination is required <br /> with the School District to ensure that the District accommodates the <br /> estimated future demand associated with build out of the Plan Area. <br /> ICS will contact and work collaboratively with potentially affected City <br /> departments and the schools to identify relevant existing conditions,project <br /> impacts,timing,and phasing of public services and their coordination. The <br /> analysis will focus on physical impacts that would result if the Specific Plan <br /> results in the need for new or altered services related to fire and police <br /> protection and schools. We will also identify recommended mitigation <br /> measures. <br /> Public Utilities: FCS will evaluate the proposed project's impacts on the <br /> public utility systems,including extension of utility lines and potential need <br /> for expansion of capacity for supply and/or treatment. As discussed in the <br /> City's General Plan,the City of Pleasanton has planned for a portion of the <br /> anticipated growth in the Plan Area by supporting Lone 7's capital <br /> improvement projects to secure more water. Zone 7 is continuing to replace <br /> or improve the existing water system in order to meet future demands, <br /> including those generated by the Plan Area. We will work closely with the <br /> City to determine the Plan's increment of growth beyond wl'at has already <br /> been studied and will identify the appropriate level of review. <br /> FCS will use the infrastructure studies prepared for the General Plan and <br /> consultation with the City staff,and the services purveyors to assess potential <br /> impacts of the proposed project related to water supply and treatment, <br /> sewage,and storm drainage. Letters describing the proposed project will be <br /> sent to all service providers. Answers will be requested to document existing <br /> and planned facilities'current and planned usages and excess capacities. FCS <br /> will assess anticipated impacts and recommend appropriate mitigation <br /> measures. <br /> Transportation and Circulation: Traffic study will be prepared for the <br /> GATES <.: <br /> *ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.