My WebLink
|
Help
|
About
|
Sign Out
ORD 0879
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
0801 - 0900
>
ORD 0879
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2004 12:05:03 PM
Creation date
3/24/1999 4:44:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 0879
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 879 <br />Page 2 <br /> <br /> 6. That the CC&Rs of the proposed development provide for '- <br /> the establishment of a Homeowners Association to <br /> maintain, among other things, all commonly held open <br /> space, the cabana club and rear yard drainage swales <br /> and silt basins, and that if a pumping system is <br /> required to boost water pressure in the area to the <br /> required level, maintenance and operation of that <br /> system shall be the responsibility of the Homeowners <br /> Association and not the City. That the CC&Rs shall <br /> be reviewed and approved by the City Attorney. <br /> <br /> 7. That the developer shall pay any and all fees that the <br /> property is subject to. <br /> <br /> 8. That all in tract easements be granted as public <br /> service easements with no reference to specific use. <br /> <br /> 9. That the number, size and location of fire hydrants <br /> in the development be subject to the approval of the <br /> Fire Department. <br /> <br /> 10. That the developer provide all street lighting <br /> facilities necessary to adequately light the streets <br /> within and adjacent to this tract at the lowest <br /> possible cost to the City. <br /> <br /> 11. That all electric power distribution and communication <br /> service systems shall be placed totally underground. <br /> <br /> 12. That approval of the water supply and distribution <br /> system be withheld until the developer has demonstrated <br /> to the satisfaction of the City Engineer that the <br /> proposed system meets all of the requirements for <br /> such a sanitary sewer system. <br /> <br /> 13. That approval of the sanitary sewer system for the <br /> project be withheld until the developer has demonstrated <br /> to the satisfaction of the City Engineer that the <br /> proposed system meets all of the requirements for such <br /> a sanitary sewer system. <br /> <br /> 14. That approval of the storm drain system be withheld <br /> until final design calculations have been made and <br /> the developer has demonstrated to the satisfaction of <br /> the City Engineer that the system fully meets the <br /> requirements of this development and all upstream <br /> areas intended to be drained through this tract and <br /> that the requirements of Alameda County Flood Control <br /> District have been met. <br /> <br /> 15. That approval of the precise design of streets and <br /> street improvements be withheld pending final design <br /> review by the City Engineer. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.