My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
110513
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2013 11:36:14 AM
Creation date
10/31/2013 11:36:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/5/2013
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.6 MGD (the "Projects to Further Expand Capacity" or "Project to Further <br /> Expand Capacity"). <br /> (b) Upon written notice from Pleasanton of its desire to proceed <br /> with any Project to Further Expand Capacity, DERWA will cause DSRSD to <br /> commence any Project to Further Expand Capacity. The exact schedule for any <br /> Project to Further Expand capacity shall be determined by DERWA with <br /> consideration given to Pleasanton's scheduling needs and any related DERWA <br /> construction or operating issues. DERWA shall use its best efforts to meet <br /> Pleasanton's requested schedule. <br /> (c) Payment for Pleasanton's share of the cost of any Project to <br /> Further Expand Capacity shall be made by Pleasanton to DERWA in three <br /> installments as follows: <br /> • One third at the time Pleasanton provides notice to DERWA to <br /> proceed with any Project to Further Expand Capacity on the <br /> schedule provided by DERWA; <br /> • One third at the time DSRSD awards a construction contract for <br /> any Project to Further Expand Capacity; and <br /> • One third at the time that the construction of any Project to Further <br /> Expand Capacity is fifty percent (50%) complete as determined by <br /> DSRSD. <br /> At closeout of any Project to Further Expand Capacity DERWA shall provide <br /> Pleasanton with a full accounting of the cost of the Project to Further Expand <br /> Capacity along with a final billing or crediting reflecting actual costs incurred in <br /> relation to the three installment payments made by Pleasanton. <br /> (d) The Parties shall work cooperatively at the technical, <br /> administrative and managerial levels to review any Project to Further Expand <br /> Capacity as it is being planned, designed and constructed and to address <br /> technical issues as they arise. <br /> (e) Pleasanton shall pay a buy-in contribution of$788,910 per <br /> MGD of firm capacity expressed on a peak day flow basis for any Project to <br /> Further Expand Capacity representing an agreed upon equitable contribution <br /> for the existing oversized facilities such as electrical, structural, pipes, controls, <br /> etc. that support the Projects to Further Expand Capacity;. The buy-in <br /> contribution shall be due and payable by Pleasanton upon DSRSD's award of <br /> the contract to construct any Project to Further Expand Capacity. The buy-in <br /> contribution shall be remitted by Pleasanton directly to the DERWA Member <br /> agencies in the following percentages: DSRSD 57%; EBMUD 43%. <br /> (f) After construction of any Project to Further Expand Capacity <br /> and the satisfaction of all provisions of this Section 5.3, Pleasanton shall have a <br /> non-facility-specific interest in the Recycled Water Treatment Plant that is a <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.