Laserfiche WebLink
BACKGROUND <br /> The first phase of the Pleasanton Tennis and Community Park was built in 1987, and at <br /> that time, five tennis courts were constructed. Approximately ten years later, the <br /> second and final phase of the park was built, and five more courts were added. Within <br /> the past two years — with the original courts more than 25 years old - significant <br /> cracking has begun to occur in the older courts and has reached a point where simple <br /> "crack repair" is no longer an option. A more extensive reconstruction and resurfacing <br /> is necessary, which will return the court surface to an "as new" condition which should <br /> extend their life for an additional 20 years or more. <br /> This project, designed by City staff, was set out for bid on August 27, 2013. On <br /> September 17, 2013, two bids were received; with the low bid from the firm of Vintage <br /> Contractors, Inc., of San Francisco; all bid documents were in order. This contractor <br /> has worked for the City in the past (Fairlands Park Tennis Court Re-surfacing project, <br /> 2006, Pleasanton Middle School Court Resurfacing and Lighting Project, 2007), and is <br /> known to be reputable and reliable. <br /> Should the Council award this contract, it is anticipated that construction will begin on <br /> October 21 , 2013, and will be completed and ready for public use on November 11, <br /> 2013 -S weather permitting. <br /> Sub tid by: Fiscal Review: Approved by: <br /> l <br /> U <br /> Daniel S h Emily Wagner Nelson Fialho <br /> Director f Operations Director of Finance City Manager <br /> Services <br /> Attachments: <br /> 1. Construction Contract <br /> 2. Bid Proposal <br /> Page 2 of 2 <br />