My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
091713
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:22:13 PM
Creation date
9/12/2013 4:14:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/17/2013
DESTRUCT DATE
15Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consolidated Dispatch Study for the Pleasanton and Pleasanton Police Department, The City of Pleasanton, <br />Livermore Police Departments CA <br />determine the /dispatch center management and technical staffs' perception of the strengths and <br />weaknesses of the existing layouts. <br />Assessment of the physical characteristics will include: <br />1) Facility Size, Layout and Capacity for Expansion/Renovation <br />2) Critical Systems; Generators, Lightening and Grounding Protection <br />3) Operational Characteristics <br />a) Redundancy and Back -Up <br />b) Survivability <br />c) Risks <br />d) Continuity of Operations <br />Communications and Information Systems: Communications and information systems such as <br />radio, 9 -1 -1, telephones, computer -aided dispatch, and other technologies must be procured or <br />transitioned to the consolidated facility. RCC's team will review the current systems architecture <br />to include system components, software licenses and support costs. The focus is on non- <br />functional and functional architecture design patterns which will determine how best to utilize <br />current investments as well as how to optimize and reduce ongoing costs through consolidation <br />and how these systems can remain operational through a smooth transition to a consolidated <br />PSAP environment. <br />The assessment of communications and information systems will include: <br />1) Existing Technologies <br />a) Voice Radio Systems <br />b) Data Systems <br />c) Information Systems: CAD, RMS, JMS, AVL, Alerting, Alarm Monitoring, etc. <br />2) Assessment of Future Technology Impacts <br />a) Next Generation 9 -1 -1 <br />b) Public Safety Broadband <br />c) Information Systems <br />d) Telephony <br />2 C August 9, 2013 by 2:00 PM 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.