Laserfiche WebLink
plans submitted to the City Engineer and the Building and Safety Division for plan check <br />and shall be subject to the review and approval of the Director of Community <br />Development prior to the approval of the improvement plans for the development, and <br />shall be operational before the first final inspection of the recreation building by the <br />Building Division. The project applicant/developer shall install signs for these parking <br />spaces stating, "Parking for Electrical Vehicles Only, Contact Community Manager for <br />More Information." <br />59. The garages for the apartment units and the single family units shall be constructed to <br />allow for the future installation of an electric vehicle charging station. Said construction <br />shall include conduit and wires for a 110 4220 -volt charging station. This measure shall be <br />shown on the building permit plan set submitted to the Director of Community <br />Development for review and approval before issuance of the first building permit. <br />60. The project applicant/developer shall develop and implement measures that will achieve <br />25 percent better energy efficiency for the project over that required by Title 24 state <br />energy requirements in effect upon the City Council's adoption of the ordinance approving <br />PUD -96. The method used and plan details shall be incorporated into the plans submitted <br />to the Building and Safety Division for plan check and shall be subject to the review and <br />approval of the Director of Community Development prior to building permit issuance. <br />61. The applicant/project developer shall develop and implement a program for reclaimed <br />water, grey water and /or rainwater harvesting systems for the subject site or as otherwise <br />approved by the Director of Community Development. The program shall be subject to <br />the review and approval of the Director of Community Development prior to building <br />permit issuance. <br />62. Water conservation devices shall be installed as part of the proposed project. The water <br />conservation devices shall be stated on the plans submitted for the issuance of a building <br />permit. <br />Homeowners Association <br />63. A Tentative Subdivision Map shall be required to subdivide the property into 97 lots for the <br />single - family units, 1 lot for the apartment buildings, 1 lot for the community building /open <br />space /landscape area, and 19 lots or parcels for the pedestrian trails, private courts and <br />open parking areas, and common areas. (Note: The number and type of lots or parcels <br />can be revised with the Vesting Tentative Subdivision Map application.) <br />64. With the first Final Subdivision Map, the project applicant/developer shall record <br />Conditions, Covenants and Restrictions (CC &R's), which shall create a homeowners <br />association (HOA) for the entire development including the apartment units and the single - <br />family units. The HOA shall be responsible for the following: <br />a) Annual inspection, maintenance, and /or repair of all common private <br />improvements including, but not limited to, storm drainage swales, gutters, inlets, <br />outfalls, channels, retaining walls, sound walls, fences, etc.; <br />b) Annual inspection, maintenance and /or repair, and reporting of all storm water <br />NPDES facilities in accordance with the Operation and Maintenance Agreement <br />Page 11 <br />