Laserfiche WebLink
The green building measures shall be shown on one of the first two pages of the plans <br />submitted for issuance of a building permit. Each point identified shall have a notation <br />indicating the sheet the point can be found, and each sheet shall note where the point is <br />located. All proposed green building measures shall be shown throughout the plan set, as <br />appropriate, as determined by the Director of Community Development. <br />A special inspection by the Planning Division shall be coordinated with regards to <br />landscaping, irrigation, and exterior materials. All of the green building measures <br />indicated on the approved checklist shall be inspected and approved by either the City of <br />Pleasanton, a third party rater, or the project applicant/developer shall provide written <br />verification by the project engineer, architect, landscape architect, or designer. <br />55. The project applicant/developer shall install photovoltaic panels on the roof areas of the <br />recreation building (Exhibit B, Sheets A4 -1 through A4-4). Patio covers, if provided with <br />the recreation building, shall also include photovoltaic panels. The details for the <br />photovoltaic panels and installation shall be incorporated into the plans submitted to the <br />Building and Safety Division for plan check and shall be subject to the review and <br />approval of the Director of Community Development prior to building permit issuance. <br />56. The apartment buildings and the single family units shall be constructed to allow for the <br />future installation of a photovoltaic- and solar- water - heating system. The project <br />applicant/developer shall comply with the following requirements for making the buildings <br />or units photovoltaic- and solar water - heating ready: <br />a) Electrical conduit and cable pull strings shall be installed from the roof /attic area to <br />the buildings' main electrical panels; <br />b) An area shall be provided near the electrical panel for the installation of an <br />"inverter" required to convert the direct current output from the photovoltaic panels <br />to alternating current; <br />C) The roof trusses shall be engineered to handle the additional load of a typical <br />photovoltaic /solar water heating system; <br />d) Plumbing shall be installed for solar -water heating; and, <br />e) Space shall be provided for a solar- water - heating tank. <br />These measures shall be shown on the building permit plan set submitted to the Director <br />of Community Development for review and approval before issuance of the first building <br />permit. <br />57. The project applicant/developer shall provide the future homeowners of the single - family <br />units the necessary information delineating the means by which photovoltaic panels can <br />be applied to the roofs of the structures covered by this approval. This information shall <br />be submitted to the Director of Community Development for review and approval prior to <br />the occupancy of the first unit. <br />58. The project applicant/developer shall provide two electric vehicle charging stations by the <br />recreation building on the side of A, C, and E Streets (Exhibit B, Sheet L -10, The <br />Commons Plan) by the recreation building. The charging stations shall be shown on the <br />Page 10 <br />