My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
090313
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 12:09:59 PM
Creation date
8/29/2013 12:09:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/3/2013
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Huy A. Ho, P.E. <br /> The City of Pleasanton <br /> August 13, 2013 <br /> Page 2 <br /> Table 1 <br /> Summary of Engineering Budget <br /> EARS Pump Station, Force Main and Collection System Design <br /> EARS PS and Pipeline Design Fel) 1 $292,305 <br /> Collection System Design F;e $39,140 <br /> TOTAL PROJECT COM- $331,445 <br /> Notes: <br /> 1. The EARS pump station and pipeline design fee assumes the pump station wet well is a precast structure. <br /> If the City decides to construct a cast in place structure,we will work with the City to develop a reasonable <br /> scope budget for the additional services. We estimate the additional services at approximately$15,000 at <br /> this time. <br /> PROJECT BACKGROUND <br /> We recently updated the City's collection system hydraulic model and performec a peer review <br /> of the EARS pump station capacity; refer to the following memoranda for background <br /> information regarding the project. <br /> • "Hydraulic Model Conversion and Calibration" dated June 28, 2013. <br /> • "Peer Review of East Amador Relief Sewer Pump Station Capacity" dated June 28, <br /> 2013. <br /> SCOPE OF WORK <br /> The scope of work described below is based on our previous experience with th; City on the <br /> S-6 project, a preliminary estimate of the project sheet count, and our experienc=_ on similar <br /> projects. The scope of work also notes which tasks are unchanged from the Apr 110, 2012 <br /> scope/budget and additional tasks. <br /> The scope/budget is based on the following assumptions: <br /> GENERAL ASSUMPTIONS: <br /> • The estimated sheet count is 47 based on the Preliminary Drawing List provided in <br /> Attachment A. <br /> • The project design will start September 3, 2013 and finish March 14, 2014 (as shown in <br /> Attachment B). This schedule assumes the City will issue the notice to proceed (NTP) <br /> September 3. If the NTP is issued earlier, Carollo can start work sooner. <br /> • Carollo may accelerate the schedule if necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.