My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
090313
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 12:09:59 PM
Creation date
8/29/2013 12:09:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/3/2013
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A-1" <br /> isr caroifo <br /> En l ina...WmMng Wonders Vieth Water., <br /> August 13, 2013 <br /> Mr. Huy A. Ho, P.E. <br /> The City of Pleasanton <br /> 200 Old Bernal Ave. <br /> Pleasanton, CA 94566 <br /> Subject: East Amador Relief Sewer Pump Station and Pipeline (EARS) - <br /> Project No. 112031 <br /> Dear Mr. Ho: <br /> The purpose of this letter is to provide a scope of work and budget estimate proposal for design <br /> of the East Amador Relief Sewer Pump Station and Pipeline (Project No. 112031). <br /> SUMMARY <br /> The East Amador Relief Sewer (EARS) Pump Station and Pipeline Project includes design of <br /> the EARS pump station and pipeline and improvements to the EARS collection system. <br /> The project has expanded in scope since we submitted a scope/budget April 10, 2012 to include <br /> improvements to the EARS. These additional tasks include review the EARS pir eline video <br /> inspection, provide design documents to repair the EARS pipeline T-Lok liner, aid design of the <br /> interconnection points between the EARS and EATS pipelines. <br /> We have met with the City to discuss the scope and drawing list since our last p tposal July <br /> 2013 and have revised our cost accordingly. The attached scope/budget outline 3 our <br /> assumptions for the revised scope/budget. <br /> We are also developing a scope/budget for design of the Dublin Trunk Main in consultation with <br /> DSRSD. There may be cost sharing opportunities since these projects will be designed in <br /> parallel, including surveying, geotechnical services, and potholing. <br /> Table 1 provides a summary of our engineering budget for the EARS pump stati pn and force <br /> main, and the collection system improvements projects. Refer to Appendix A for the drawing list <br /> and Appendix C for the detailed Budget Estimate. <br /> We look forward to moving forward on this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.