My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
090313
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 12:09:59 PM
Creation date
8/29/2013 12:09:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/3/2013
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Huy A. Ho, P.E. <br /> The City of Pleasanton <br /> August 13, 2013 <br /> Page 8 <br /> • Topographic survey map. <br /> • Final geotechnical report. <br /> 3.0 Detailed Design <br /> This task has been revised based on discussions with the City. <br /> 3.1 Design Criteria Memorandum: With assistance from the City, Carollo will gather <br /> and review existing data, drawings, and other information related 10 the project. <br /> Working with City staff, Carollo will evaluate and finalize the following key design <br /> elements and summarized in a memorandum: <br /> • Number and size of pumps. <br /> • Discharge force main routing. Note it is assumed the force main will <br /> connect to the Pleasanton Junction Structure and be routed with the <br /> DSRSD Dublin Trunk. <br /> • Brief review of pre-cast vs. cast in place type wet well structures, the <br /> review will estimate the cost and lifespan of each type of facility. <br /> • Electrical single-line diagram and P&ID. <br /> • Brief review of alternatives to install a macerator in the purip station wet <br /> well. <br /> Carollo will prepare a draft Design Criteria Memo (DCM)to docurr ent the selected <br /> design criteria and decisions made on various issues based on the above work <br /> and evaluations. The DCM will become the basis for the detailed design. The draft <br /> DCM will be finalized after review and incorporation of comments 'rom the City. <br /> Deliverables: <br /> • Design Criteria Memo. <br /> 3.2 Pump Station and Pipeline Final Plans, Specifications, and Cost Estimate: <br /> Carollo will prepare the necessary specifications and CAD drawings for the <br /> general, civil, architectural, mechanical, structural, electrical, and i,strumentation <br /> requirements for the project. Final plans and specifications will be based on the <br /> final DCM, City's design guide, and Carollo's standards. <br /> The City will prepare the front end specifications and Carollo will prepare the <br /> technical specifications in the 16-section CSI format. Drawings wil be prepared on <br /> standard 22-inch by 34-inch drawing sheets. <br /> Carollo will submit plans and specifications to the City at 50 percent and 100- <br /> percent completion points for review and approval. The 100 percent submittal will <br /> include applicable comments from the 50% design submittal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.