My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
082013
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:30:17 PM
Creation date
8/14/2013 2:16:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2013
DESTRUCT DATE
15Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j. Design Clarification — CONSULTANT will coordinate design clarifications <br /> with T.Y. Lin International or BKF Engineers; CITY; and Caltrans as <br /> appropriate. CONSULTANT shall maintain a log to track processing of <br /> design clarifications. <br /> 3. CONSTRUCTION SURVEYING <br /> CONSULTANT will review staking requests submitted by Contractors' and <br /> coordinate staking with CITY'S construction staking firm. <br /> 4. INSPECTION AND TESTING <br /> CONSULTANT shall: <br /> a. Provide construction inspection, sampling and materials testing in <br /> accordance with Caltrans procedures for all project items. <br /> b. Coordinate the activities of testing laboratories, surveyors and inspectors, <br /> representatives from utility companies and the administration of all project <br /> permits and utility relocations. <br /> c. Coordinate with local residents, proprietors, and land owners to minimize <br /> impact of construction on said parties. <br /> d. Coordinate with Caltrans and other outside agencies as appropriate <br /> e. Act as single point of contact for project inquiries and coordinate press <br /> releases as appropriate <br /> f. Review and coordinate with Caltrans, designer of record, affected <br /> business and City of Pleasanton contractor's proposed del:ours and lane <br /> closures. <br /> g. Enforce labor regulations as included in contract specifical ions. <br /> h. Maintain an up-to-date set of plans and specifications at the job site. <br /> i. Review all certificates of inspections and tests. <br /> j. Provide final inspection and punch list. <br /> k. Collect and check record drawing information as furnished by the <br /> Contractor, furnish information to the designer for preparation of record <br /> drawings. <br /> 5. PRECONSTRUCTION SURVEY FOR MIGRATORY AND NON-GAME BIRDS <br /> Consulting Services Agreement between July 16, 2013 <br /> City of Pleasanton and Carlson Management, Inc. Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.