Laserfiche WebLink
Mr.Mike Fulford <br /> 6/4/13 <br /> Page 2 of 4 <br /> 2. Grading <br /> o Import Fill for drainage and berming <br /> o Cut/fill of onsite material <br /> 3. Drainage <br /> o Surface drainage with minimum feasible underground storm drainage <br /> o Overland drainage channel and retention pond to collect storm water from <br /> park core and drive in addition to oak woodland area <br /> 4. Site Construction <br /> o Pathways <br /> • Asphalt, 9 feet wide for main paths <br /> • Decomposed Granite, 6 feet wide for creek walk and interpretive <br /> area <br /> o Footbridges (3) over drainage channel, prefabricated, with concrete <br /> abutments <br /> o Entry nodes with concrete paving, focal points, possible gateways and/or <br /> entry monuments <br /> o Perimeter fencing is not included <br /> 5. Electrical <br /> o Pathway lights, 85' to 135' spacing, LED, 16' tall pole-mounted fixtures <br /> 6. Amenities <br /> o Benches, possibly with small prefabricated shade structure covers <br /> o Picnic tables, possibly with small prefabricated shade structure covers <br /> o Interpretive area in southeast corner <br /> o Group gathering/seating space <br /> o Interpretive exhibits/signs <br /> o Nature trail <br /> o Information and regulatory signage <br /> o Park entry signs or monuments at up to three entry points along Oak <br /> Vista Drive to match existing park sign <br /> o Drinking fountains for joggers, walkers, dogs, with potable water line <br /> extension <br /> 7. Planting <br /> o Trees, predominantly 5- and 15- gallon size <br /> o Hydroseeded grasslands/meadows <br /> o Shrub and forb planting from containers for understory areas <br /> o No irrigation system <br /> Additional Services for the Oak Woodland are detailed on the attached spreadsheet and <br /> subconsultant proposals, and include: <br /> • Design and layout of pathways, waterway, focal points, bench locations, <br /> drinking fountain locations, and nature study area <br /> • Meet with City Staff to review design development of Oak Woodland, <br /> anticipated two meetings. <br /> • Grading and Drainage Plans (limited to on-site storm drainage) <br /> • Demolition Plans <br /> • Site Construction and Layout Plans <br /> • Pathway Lighting Plans, schedules, and diagrams <br /> • Planting Plans <br /> • Entry signs/monuments/nodes <br />