My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
061813
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2013 4:38:34 PM
Creation date
6/12/2013 4:38:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2013
DESTRUCT DATE
15Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
natural vegetation, an asphalt and decomposed granite pathway/trail system, three <br /> pedestrian foot bridges over drainage channels, pathway lighting, a storm water <br /> detention pond that will serve a portion of the Bernal Community Phase II park storm <br /> water requirements, interpretative and area signage, and potentially drinking fountains <br /> near key entry points. The estimated park and Oak Woodlands budget is included as <br /> Attachment 2. <br /> DISCUSSION <br /> Because Harris Design is fully engaged in the Bernal Community Park project that <br /> includes components of the Oak Woodland area and because of the significant <br /> integration needed between the two, staff determined that amending Harris Design's <br /> scope of work was the most cost effective and productive way to proceed with the Oak <br /> Woodland area. The proposed fee schedule and scope of work is consistent with <br /> current industry fees and staff has been satisfied with the work completed by Harris <br /> Design to date. Staff anticipates that all work, including services related to the First <br /> Amendment, will be completed to allow for project bidding in spring 2014. <br /> Submitted by: Fiscal Review: Approved y: <br /> Lvcs <br /> Steven B clan 6,Emily Wagner Nelson Fialho <br /> Assistant City Manager Director of Finance City Manager <br /> Attachments: <br /> 1. First Amendment to Professional Design Services Agreement for the <br /> Bernal Community Park Phase II <br /> 2. Bernal Community Park and Oak Woodland Budget <br /> 3. Bernal Community Park and Oak Woodland Illustrative Plan <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.