My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
061813
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2013 4:38:34 PM
Creation date
6/12/2013 4:38:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2013
DESTRUCT DATE
15Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t W rgittnASOurst Fear <br /> Basic Services <br /> DD CD Total Expenses <br /> Architectural $12,000 $18,000 $30,000 $2,500 <br /> Consultants DD CD Total <br /> Structural $1,000 $4,000 $5,000 $500 <br /> Specifications $500 $2,500 $3,000 <br /> Cost Estimator $1,500 $1,500 <br /> Total Standard Cnslts $1,500 $8,000 $9,500 $500 <br /> Total $13,500 $26,0001 $39,500 <br /> Reimbursable Expenses $750 $1,750 $2,500 <br /> Total $2,500 <br /> Additional Services(estimated) <br /> Additional Meetings TBD <br /> Open Bid Documents for Restroom TBD <br /> Substitution Request Evaluations TBD <br /> Detailed Customization of Vendor Product TBD <br /> Computer Rendering $3,000 <br /> LEED Tracking TBD <br /> LEED Certification TBD <br /> Assumptions <br /> Construction Cost $575,000 <br /> Pre-Engineered Restroom Square Footage est.800 <br /> Trash&Storage Square Footage 1,000 <br /> Cost Estimates 1 <br /> Restroom Design to be coordinated with Pre-engineered Restroom Vendor <br /> Detailed Design, Engineering and Specifications for Restrooms by Vendor <br /> Deferred Permit Submittal for Restrooms by Vendor <br /> Pad Design and Utilities to Restroom by others <br /> Hosebibs,Stormwater Connections and Sanitary Sewer systems for Storage and Trash by others <br /> Electrical and Lighting for Storage and Trash by others <br /> See attached Architectural Scope document for additional assumptions <br /> Should the scope of the project or of the architectural components vary significantly from these <br /> assumptions the fee proposal would need to be adjusted accordingly <br /> These fees are based on current billing rates and would need to be adjusted should this scope <br /> duration exceed 1 year from date of proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.