My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
061813
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2013 4:38:34 PM
Creation date
6/12/2013 4:38:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2013
DESTRUCT DATE
15Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BSA Architects <br /> Banal Park Phase I 1-4 3evisedS :up e <br /> 5/31/13 <br /> Architectural S cope of Project <br /> Project Phase Progress <br /> Existing architectural design documents will be used for 65%Submittal <br /> Sel lection of preferrecF 'r-r, ngineered Building\e ndor will need tdbegin immediately <br /> DD level redesign to be expedited to establish architectural character for project <br /> Trash and Storage design to be updated to be consistent with new a rchitectural character <br /> CD P base documentation of all z hitectural scope to be completed for 90% Submittal <br /> General Assumptions: <br /> All Civil, Landscape, Electrical and Lighting scope associated with Architecture scope by Prime & <br /> direct subconsultants <br /> All Site Utilities associated with Architecture scope ii ncluding Domestic Water, Sanitary Sewer, Storm <br /> Water,Power&Telecom,and Hosebibs by Prime&direct subconsultants <br /> All Site Accessibility scope associated with Architecture scope by Prime&direct subconsultants <br /> Architectural,Structural h 'y Archie ct and sul-:s ubconsultants <br /> Restroom Building at Soccer Plaza <br /> Approx. 80 0 S.FF 'r-I engineered Building by Vendor <br /> Design Coordinated with selected Pre-Engineered Building Vendor <br /> Health Dept.st tbmittal based on Vendor Documents by Architect <br /> Bid Documents based on Vendor Documents by Architect <br /> Permit ft tbmittal as deferred submittal by\e ndor <br /> Electronic door hardware specified by Architect <br /> Electrical&dal me â– nnection anch xlco .ntroui iterfaceE ty Prime&direct subconsultants <br /> All F .ad preparation,xi ilities andi i ifrastructurelby F 'rime&direct subconsultants <br /> Trash En closure <br /> Approx. 200 S.F. Open Building w/ Roof <br /> Architectural and Structural by Architect and sub-s ubconsultant <br /> Roof drain to storm drain by Civil <br /> Electrical and Lighting by F 'rime&direct subconsultants <br /> Hose Bib and Area Drain by Prime&direct subconsultants <br /> All F iad preparation, xi ilities andit tfrastructurelby F 'rime&direct subconsultants <br /> Small St. orage Structure(s) for Soccer lq luipment <br /> Approx. 800 S.F. Enclosed Building <br /> Architectural and Structural by Architect and sub-s ubconsultant <br /> Natural ventilation only provided by metal louvers <br /> Roof drains to storm drain by Civil <br /> Electrical and Lighting by Prime&direct subconsultants <br /> Hose Bib and ft tredDrain byF 'rime&direct subconsultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.